Home Companies Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Crawler Type Multifunctional Drilling Rig Tunneling And Rock Drilling Equipment

Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 128, Hailin Road, Rongtai Avenue, Wenjiang District, Chengdu City, Sichuan, China.

Contact name:liu

Inquir Now

Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Crawler Type Multifunctional Drilling Rig Tunneling And Rock Drilling Equipment

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

ZML161 Rock Drilling Equipment​ multifunctional crawler type drilling rig

 

The ZML161 drilling rig is equipped with a central rotary table, suitable for multi station drilling construction. Horizontal lifting of 4M, driven by diesel engine, equipped with dry dust removal method for dust reduction, suitable for outdoor construction environment. Adopting a plunger variable pump and load feedback system, it has power protection and pressure cut-off functions. Equipped with construction angle display to ensure drilling verticality; The entire machine is equipped with a fully hydraulic control system and remote control function, making operation convenient and reliable.

 

Technical specifications

 

 

Basic parameters
oneWeight (kg)ten thousand and five hundred
twoDimension (L * W * Ht) mm7100 * 2450 * 2900
threecontrol modeRemote control+handle
fourRated pressure of hydraulic system (Mpa)25
fiveMaximum horizontal lifting height (mm)4100
Equipment configuration
oneDrilling armquantity1
structural styleOil cylinder+rotary reducer
Mast rotation angle (degrees)±180
twomastquantity1
Promotion typeMotor reducer+chain
Total length of advancing beam (mm)6320
Advance stroke (mm)3390
Maximum propulsion force (kN)85
Maximum lifting force (kN)85
Applicable drill pipe specifications (mm)Φ76-89×1500-3000
Compensation stroke (mm)1000
threechassisallocationTrack type
Walking speed (km/h)Low speed ≥ 1.2, high speed ≥ 2
Climbing ability (%)≤36
Platform rotation angle (degrees)360
Ground clearance≥270
Maximum departure angle (°)25
Ground specific pressure (Mpa)0.04
engineManufacturerYuchai
 Power (kW)73.5
 Emission standards for exhaust gasesTurbocharging, National III
Fuel tank volume (L)200
fourDrilling hydraulic systemHydraulic control modeElectrohydraulic multi way valve control
Hydraulic oil tank volume (L)455
Return oil accuracy( μ M)10
fiveWork organizationDrilling diameter (mm)90-300
Crushing methodImpact rotary
Power head output speed (rpm)35-70
Maximum torque output of the power head (N.m)6000
sixDrilling rig control systemControl type of drilling rig systemElectrohydraulic multi way valve control
Control panel typeHandle type+remote control
Electronic system power supply type24VDC

 

Main features

Dynamic system

The whole machine can replace different power heads(DTH, top drive, coring) according to construction needs, making construction more convenient, reducing costs, and doubling production;

 

Rotating arm structure

By adopting a rotary arm structure, the operating range after one positioning is greatly increased. The drilling arm can rotate about 360 °, achieving any angle construction;

 

Control costs

By using pilot valves and variable piston pumps with load feedback systems, it has the functions of power protection and pressure cut-off. While effectively adapting to the total flow demand of various executing components, it achieves the best power matching under different working conditions and maximizes energy conservation;

 

Security measures

When drilling, the wind and water linkage system is used to reduce the large amount of dust generated during tunnel construction. While drilling, the crushed stones are washed out of the hole through high-pressure water, reducing the problem of sticking during drilling, achieving the goal of rapid drilling, improving work efficiency, and reducing construction costs;

 

Pipe shed construction

Both single rod drilling and drilling with casing can be used. When the geological situation is complex and there is collapse, the casing construction method can be adopted, which means the outer casing and inner drill rod drill to the required depth at the same time. Firstly pull out the inner rod, then pull in the steel pipe, finally pull out the outer casing;

 

Emergency rescue

During the construction process, in case of danger, geological exploration, geological improvement, and support operations in the danger zone can be quickly completed. If the underground space is obstructed by collapse, casing operations can be used to quickly transport air, water, and other rescue materials to the trapped personnel;

 

Company Overview

Hot Products

ZMLH-08-A equipment used for borehole drilling 1,ZMLH-08-A High-Arm Rock Drilling Rig is designed ...
ZMLH-08-A High-Arm Rock Drilling Rig Elevating drilling rig 1,ZMLH-08-A High-Arm Rock Drilling Rig ...
DW902 Multi-functional Anchor Rod Carrier The DW902 anchor rod carrier is used for tunneling and ...
Hydraulic Jumbo Rock Drill Mining Hydraulic Tunneling Jumbo Used For Underground Mine​ Introduction: ...
Hydraulic Jumbo Rock Drill Underground mining rock drilling trolley Introduction: It is a small and ...
Hydraulic Jumbo Rock Drill And Underground Mining Rock Drilling Carriage Used For Mine Drilling Hole ...