Home Companies JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

GE Gas Turbine Quick Release Flange Stainless Steel Blind Hub 304 Seal Ring Clamp

JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

Contact Us

[China] country

Trade Verify

Address: YUANHUA, HAINING, ZHEJIANG, CHINA

Contact name:Terry White

Inquir Now

JIAXING PASSION NEW ENERGY TECHNOLOGY CO., LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

GE Gas Turbine Quick Release Flange Stainless Steel Blind Hub 304 Seal Ring Clamp

Country/Region china
City & Province zhejiang
Categories Clamps
InquireNow

Product Details

GE Gas Turbine Quick Release Flange, Stainless Steel Blind Hub, 304 Seal Ring, Clamp

GE General Electric Gas Turbine Quick Release Flange, Blind Hub, Seal Ring, Clamp

 

YLOCK quick release flanges provide high quality, short lead-times and significant cost savings.

All necessary tests, including bending, vibration and burst are performed under thermal pressure

by the supervision and approval of TUV as per ASME B31.1 and B31.3.

Produced in a comprehensive range of sizes and materials,

YLOCK quick release flanges offer versatility, compactness, weight and cost effectiveness in piping systems.

 

YLOCK quick release flange family offers various advantages versus conventional flanges:

· Quick installation

· Significant torque decreases by 93% in single-bolted and 75% in 4-bolted versions, compared to conventional flanges

· Mechanical sealing

· High pressure and temperature strength

· Various working conditions

· Low maintenance

· Less accessory requirement

· Lighter design

 

The YLOCK quick release flanges comprise:

· A pair of hubs, welded to the pipe, similar to a flange,

· A seal ring that is a modified cone ring, providing excellent leak tightness’

· A clamp set that can be rotated around the hub to suit the most practical positions.

 

Standards:

· ASME B31.1 & ASME B31.3

· European Pressure Equipment Directive(2014/68/EU)

· National Association of Corrosion Engineers (NACE Mr0175)

 

Size:

· One bolted clamp: ¾” – 3” (DN20 - DN80)

· Four bolted clamp: 2½” – 4” (DN65 - DN100)

 

Package:

Cartons, Plastic case, Plywood case.

 

Remarks:

1. Lead-time:7-15 working days after receiving payment.

2. Payment Term:T/T, L/C, Western Union.

3. Warranty:5 years for the full system, 15 years for the vacuum tube,and 1year for accessories.

4. Trade Term: FOB, CFR and CIF.

 

 

 

 

Hot Products

300L Presssure Solar Water Heater 304 Stainless Steel 250L Solar Heating System Advantage: 1. The ...
300L White Tank Pressure Solar Water Heater 304 Stainless Steel Solar Thermal System Advantage: 1. ...
200L Pressure Solar Water Heater 20tubes High Pressure Solar Collector Description Material of out ...
200L Pressurized Solar Water Heater Roof Mounted Solar Heating Collector Working Principle: The ...
150L White Tank Solar Water Heater 300L Pitch Roof Pressure Solar Heating Collector Features: 1. ...
150L Pressure Solar Water Heater 316 Stainless Steel Solar Heating Collector Advantage: 1. The ...