Home Companies FAMOUS Steel Engineering Company

Galvanized Metal Floor Deck Formwork Floor Slab System Construction

FAMOUS Steel Engineering Company

Contact Us

[China] country

Trade Verify

Address: Huafeng Road 2#, Xiacheng District, Hangzhou City, Zhejiang China

Contact name:Tomy.GAO

Inquir Now

FAMOUS Steel Engineering Company

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Galvanized Metal Floor Deck Formwork Floor Slab System Construction

Country/Region china
City & Province hangzhou zhejiang
Categories Formwork
InquireNow

Product Details

Australia Standard Galvanized Metal Floor Deck Formwork Floor Slab System Construction

Quick Detail:

1. faster erection.

2. fire-resistance.

3. high strength.

4. cost saving.

 

The thickness of the floor slab is 0.8mm, 1.0mm, 1.2mm, width 688mm~940mm, height 5 1 mm ~76mm. The engineering floor slab and reinforced concrete structure work together, which is a composite structure. The laying of the floor slab is connected with the steel beam, the end of the plate is welded with the steel beam, and the stud and the steel beam are penetrated and welded in the middle; the connecting plate is connected with the special clamping tongs and the pressure hole is connected; Galvanized plug plates are spot welded with floor slabs and steel beams. If the profiled cutting plate with curved area is cut by a plasma cutting machine, the slit is smooth and the surface is completely galvanized.

 

Specification:

Product NameGalvanized steel floor deck formwork
Base materialHot dip galvanized high strength steel sheet
Thickness0.6-1.5mm
Effective Width200-1100mm customized
 
Height
 
30-140mm per design and calculation needs
 
QualitySGCC, DX51, ASTM 653, A792, G450, G500, G550 (MPA)
Based Zinc-coatingUp to 350g/m2

 

Our steel deck has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. It has following features:
Efficient - low use of steel and concrete.
Versatile – top or bottom flange application.
Nestable profile gives low transport and handling costs.

 

To complete our floor decking products we advise a complete floor slab construction by adding the supply and laying of reinforced concrete. This single point solution allows a fully integrated metal deck and concrete slab with associated trade interface and program advantages.

 

Composite slab which is comprised of lightly reinforced concrete cast on profiled steel decking are an option whether the beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are normally reinforced using an upper layer of mesh and, sometimes additional bars in the troughs (usually for longer periods of fire resistance and heavy loads). Fiber reinforcement may also be used. Spans of up to 4.5 m can be achieved using trapezoidal decking. Some so-called deep decking profiles also exist (over 200 mm deep), that can span 6 m or so without propping during construction.

 

Product testing:
a. Dynamic loading test, qualified building slabs are subjected to several sets of dynamic loading tests, and the shear-bonding coefficient of the composite slab is obtained. The combined ability of the building slab and concrete is tested, and it is obtained that it is subjected to large span. Design load.
b. Fire test, using 1.5 sets of floor slabs to do 1.5 hour, 2 hours and 3 hours load fire test in the fireproof laboratory, and measure the temperature distribution inside the floor, test whether the floor support plate meets the heat insulation requirements, and is fire resistant. Positive bending moment resistance of the stage.

 

While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.

 

The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.

 

So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.

 

Warmly welcome various clients from International market to enquiry and visit us!

Hot Products

Solar Guardrail Metal Sheet Rectangular Steel Large Planter Box Specification item value Warranty 3 ...
Prefabricated Q345b Industrial Steel Structural Buildings Warehouse Exported to African Market Steel ...
American Standard Customized Q355B Steel Structure Workshop Warehouse Buildings The steel structure ...
Product Description: Industrial Steel Buildings are prefabricated structures used for multiple ...
Product Description: Industrial Steel Buildings are metal framed buildings which are designed and ...
Product Description: Our Industrial Steel Buildings are crafted from the highest quality structural ...