Home Companies FAMOUS Steel Engineering Company

2.0mm Galvanized Steel Composite Floor Deck For Floor Construction

FAMOUS Steel Engineering Company

Contact Us

[China] country

Trade Verify

Address: Huafeng Road 2#, Xiacheng District, Hangzhou City, Zhejiang China

Contact name:Tomy.GAO

Inquir Now

FAMOUS Steel Engineering Company

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

2.0mm Galvanized Steel Composite Floor Deck For Floor Construction

Country/Region china
City & Province hangzhou zhejiang
Categories Metal Building Materials
InquireNow

Product Details

2.0mm Galvanized Steel Composite Floor Deck for Floor Construction

Composite floor deck is widely used in power plants, power equipment companies, automobile exhibition halls, steel structure workshops, cement warehouses, steel structure offices, airport terminals, railway stations, stadiums, concert halls, grand theaters, large supermarkets, logistics centers, and the Olympics. Steel buildings such as stadiums and stadiums.


Adapting to the requirements of rapid construction of the main steel structure, it can provide a firm working platform in a short time, and can use multiple floors to lay the profiled steel plate and layer the concrete flow of the concrete slab.

 

Main features:

 

1: Adapt to the requirements of rapid construction of the main steel structure, it can provide a firm working platform in a short time, and can use multiple floors to lay the profiled steel plate and layer the concrete flow.
2: In the use stage, the floor slab is used as the tensile reinforcement of the concrete slab, which also improves the rigidity of the slab and saves the amount of steel and concrete.
3: The embossing on the surface of the profiled board creates the greatest bonding force between the floor slab and the concrete, so that the two form a whole, with stiffeners, so that the floor slab system has high bearing capacity.
4: Under cantilever conditions, the floor slab is only used as a permanent template. The length of the cantilever can be determined according to the section characteristics of the floor panel. In order to prevent the cracking of the cantilever plate, it is necessary to match the design of the structural engineer with the negative reinforcement at the support.

 

Specifications:

Namesteel decking formwork
Base materialHot Dipped Galvanized Steel Sheet
Steel GradeSGCC
Yield strengthQ235 or Q345 Refer to Standards GB/T1591-2008
Thicknes0.8 -1.5mm(normal 0.8,1.0,1.2)
Zinc coating60-275g/m2
Wave Height51mm-76mm
EffectiveWidth688mm-940mm

 

Length

0-11.8m
Less than 5.8m load in 20GP
5.8m-11.8m load in 40GP
PackingBundle ,water-proof package with steel belt
Delivery time

20 days after confirmation

 

 

Following are some of typical profiles available in market:

  1. Closed type galvanized steel floor decking
YXB51-200-600
YXB65-186-558
YXB60-253-760
YXB60-180-540
YXB51-200-600
YXB65-186-558
(2) Opened type galvanized steel floor deckingYX75-230-690
YX75-200-600
YX38-152-915
YX51-305-915
YX76-305-915
YX75-230-690
YX75-200-600
YX51-250-750
YX51-335-1005
YX76-344-688
(3) swallow tail galvanized steel floor deckingYX51-200-600
YX51-190-760
YX51-200-800
YX51-200-600

 

Advantages:

 

Greater Durability
The steel base product has a Z350 zinc-coating mass. It was selected to provide superior corrosion protection in service, directly as a result of increased coating mass. FAMOUS steel is also available with a Z450 coating mass with a 15 year warranty*. Comprehensive shear stud welding tests across a range of base thickness with both coating masses were undertaken to ensure consistent results can be achieved on site.

Unbeatable Strength
Steel and concrete composite slabs are lighter and stronger than most conventional slabs. The steel decking provides tensile reinforcement, combining with the compressive strength of the concrete for an all round stronger slab. Steel decking profiles are designed to prevent any longitudinal slip between the steel and concrete in the slab itself, and any transverse movement between the slab and supporting beams.

Greater Savings
The weight savings achieved in composite slabs can be passed on to other areas of the design, such as foundations. And because steel decking acts as permanent formwork, it can significantly reduce the need for propping or temporary formwork -saving both time and money.

 

While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.

 

The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.

 

So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.

 

Following are some typical detail:

 

Warmly welcome various clients from International market to enquiry and visit us!

Hot Products

Coal Storage Bunker Domes Roofing Structures for Cement Lignite Clinker Gypsum Slag Storing The dome ...
Australia Standard Fabricated Industrial Steel Structure Frames Warehouse Shed The steel structure ...
Australia Standard Fabricated Steel Structures Industrial Steel Buildings Fast Installation The ...
Economic Heavy Steel Structure Workshop and Warehouse with Overhead Bridge Cranes The steel ...
Granite and Marble Stone Earehouse and Aggregate Mining Equipment Steel Frames Construction The ...
Prefabricated Structural Steelworks for Crushed Broken Stone Mining and Quarrying Construction Site ...