Shenzhen Guangya Automatic Machinery Ltd |
Verified Suppliers
|
|
Application:
• Unitized
• Totes or slab Pallets not strong enough to be supported by chain conveyor
• Pallet loads when bottom boards are perpendicular to the rollers
• Pallet loads when bottom boards are parallel to the rollers
• Side loading/unloading
• Accumulation of loads
• Loads that must be aligned
Conveyor Roller Parameter
Model | Roller | Frame | Bearing(kg/m) | |||
Diameter | L | Spacing | Size | L | ||
GA-25 | ø25 | 150-600 | 30.40.50 | 40*20*2 | 1000-3000 | 30 |
GA-38 | ø38 | 150-600 | 50.75.100 | 60*30*2.5 | 1000-3000 | 300-80 |
GA-50 | ø50 | 150-1000 | 75.100.120 | 60*30*3 | 1000-3000 | 500-100 |
GA-60 | ø60 | 150-1000 | 50.75.100 | 90*30*3 | 1000-3000 | 600-150 |
GA-76 | ø76 | 150-1000 | 100.150 | 120*30*3 | 1000-3000 | 1000-500 |
Product Name | Good price chain driven live roller conveyor China manufacturer | |
Models | Double Steel roller type | |
Length(Closed/Expended) | 2000mm - 4800mm (6.6'-15.7') | 2500mm - 6000mm (8.2'-20') |
Width | 400mm, 500mm, 600mm, 18'', 24'' | |
Height (Adjustable) | 620-990mm (24.4''-39'') | 710-1120mm (28''-44'') |
Load Capacity | 300kg/m (100lbs/ft) | |
Roller | Ø50mm Steel Roller With Precision Bearing Inside | |
Key Word | roller conveyor |
Conveyor Chain FAQ
Q: What's the lead time?
A: It takes 5-10 days for production in factory depends the total
quantity. Each belt is custom made based customer side exact
parameters.
Q: How long is your company in business?
A: We shenzhen guangya wire belt company started business in 2003
and only dedicated to stainless steel chain & wire belt
production.
Q: How do I order?
A: If you can visit our company, we can fix all technical details
quickly by live discussion. We can also send you drawing so you can
specify needed configuration. Once the wire belt structure is
confirmed, we will sign contract. We accept T/T & L/C payment.
Q: How can I verify the belt?
A: Before delivery, you can send engineer to verify it by agreed
technical design.