Home Companies CHINA HARZONE INDUSTRY CORP.,LTD.

Emergency Bridge To Rescue Fast Erection 51m Mechanized

CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Us

[China] country

Trade Verify

Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province

Contact name:Sun Ruyu

Inquir Now

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Emergency Bridge To Rescue Fast Erection 51m Mechanized

Country/Region china
City & Province wuhan hubei
Categories Uninterrupted Power Supply (UPS)
InquireNow

Product Details

Emergency Rescure Fast Erection 51m Mechanized Bridge

 

Description of Emergency Rescure Fast Erection 51m Mechanized Bridge :                                                              

 

Emergency Rescure Fast Erection 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

Emergency Rescure Fast Erection 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

 

Emergency Rescure Fast Erection 51m Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

 

Main features of Emergency Rescure Fast Erection 51m Mechanized Bridge:

 

1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)

2 Large single span: max. single span reaches 51m

3 Less composition unit: one erection vehicle, six transportation vehicle

4 Fast erection: 90min (To erect a 51m bridge)

5 High mechanization level, low labor intensity: using remote control operation

6 Less operators: 3-4(not including drivers)

 

Emergency Rescure Fast Erection 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

Hot Products

Small Span From 40m To 80m Steel Truss Bridge Compact Panel Bridge Small Span From 40m To 80m Steel ...
Designed Span 6-60m Deck Type Steel Deck/ Wood Deck Steel Truss Bridge Designed Span 6-60m Deck Type ...
54m Emergency Bridge Steel Truss Bridge Description of 54m Emergency Bridge Steel Truss Bridge 54m ...
Designed Load HL-93 Compact Panel Bridge Steel Truss Bridge Description of Designed Load HL-93 ...
Length 81m Design Load HS20-44 Steel Girder Bridges Description of Length 81m Design Load HS20-44 ...
1m Passenger Foot-Bridge Permanent Steel Girder Bridge Description of 1m Passenger Foot-Bridge ...