Home Companies CHINA HARZONE INDUSTRY CORP.,LTD.

Max. Current Velocity 2m/S Heavy Emergency Bridge Modular Fast Erection

CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Us

[China] country

Trade Verify

Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province

Contact name:Sun Ruyu

Inquir Now

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Max. Current Velocity 2m/S Heavy Emergency Bridge Modular Fast Erection

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

Max. Current Velocity 2m/S Modular Fast Erection Heavy Mechanized Bridge

 

Description of Max. Current Velocity 2m/S Modular Fast Erection Heavy Mechanized Bridge:                                                                                  
                                                                

Max. Current Velocity 2m/S Modular Fast Erection Heavy Mechanized Bridge is a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.

 

Specification of Max. Current Velocity 2m/S Modular Fast Erection Heavy Mechanized Bridge: 
Total weight30.6t
Folded outline dimension (L*W*H)10890*3150*3660 mm
Tracked load60t
Axle load13t
Roadway width3.8m
Span length15m
Max. bridge length75m
Max. height (from shoes to deck)5.5m
Erection time for a single span12 min
Max. current velocity2m/s
Operator7 operators for a single span

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Max. Current Velocity 2m/S Modular Fast Erection Heavy Mechanized Bridge  consists of five transport vehicles with bridge spans with a length of 15m. The chassis is type XC2300/8×8 15T class cross-country truck, with advanced engine, gearbox and axles etc. The trestles are controlled by hydraulic winch; the outriggers ban be adjusted by automatic control technology, with double class hydraulic cylinders. The bridge is erected with shear style erection, and span stretching at mean time to keep safety and stability in erection.            

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.

 

2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.

 

3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.

 

Our Service

1,For all your inquires about us or our products,we will reply you in details within 24 hours.

 

2,We own professional sales&after-sales services who can speak fluent English language.

 

3,Tail-made Welcome to submit your idea, we can turn your idea to products.

 

4,Discounts are offered based on order quantities.

 

Hot Products

Small Span From 40m To 80m Steel Truss Bridge Compact Panel Bridge Small Span From 40m To 80m Steel ...
Designed Span 6-60m Deck Type Steel Deck/ Wood Deck Steel Truss Bridge Designed Span 6-60m Deck Type ...
54m Emergency Bridge Steel Truss Bridge Description of 54m Emergency Bridge Steel Truss Bridge 54m ...
Designed Load HL-93 Compact Panel Bridge Steel Truss Bridge Description of Designed Load HL-93 ...
Length 81m Design Load HS20-44 Steel Girder Bridges Description of Length 81m Design Load HS20-44 ...
1m Passenger Foot-Bridge Permanent Steel Girder Bridge Description of 1m Passenger Foot-Bridge ...