Home Companies CHINA HARZONE INDUSTRY CORP.,LTD.

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Us

[China] country

Trade Verify

Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province

Contact name:Sun Ruyu

Inquir Now

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

CB 200 Metal Truss Bridge Compact Panel Bridge

CB 200 Metal Truss Bridge Compact Panel Bridge Description:

 

  • replacing collapsed bridges (between 3-metres and 200-metres long)

  • restoring access to roads washed out in storms

  • providing cost-effective temporary structures for roading projects

 

CB 200 Metal Truss Bridge Compact Panel Bridge Specifications:

 

Type CB100
Designed Span6-60m
Designed LoadHS25-44,Axle Load 20t,tracked load 50t
Panel Dimension1.448*3.048m
Carriageway Width4.2m/7.35m
Deck typesteel deck/ wood deck

 

The simple component of CB 200 Metal Truss Bridge Compact Panel Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. CB 200 Metal Truss Bridge Compact Panel Bridge girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. CB 200 Metal Truss Bridge Compact Panel Bridge deck is combined of transom, CB 200 Metal Truss Bridge Compact Panel Bridge plate and kerb. CB 200 Metal Truss Bridge Compact Panel Bridge frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. CB 200 Metal Truss Bridge Compact Panel Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.

 

 

The company's emergency transport engineering equipment plays an important role in the disaster relief in Songhua River and Zhouqu, Gansu Province.

At 12:30 noon on August 5,2010, a military engineering regiment of the Shenyang Military Region successfully erected a 183-meter emergency floating bridge made by Huazhou heavy industry in the UND river section of the Songhua River Jilin City River as the last shore boat docked with the river bank, through the flood-interrupted Jilin to Yongji, rock, Huadian Direction of the life of the passage, a large number of relief supplies smoothly through the pontoon, rushed to the disaster area.

The bridge is Jilin City's only route to the hard-hit cities of Yongji, Iwaki and Huadian. On July 28, the great flood destroyed this life passage, once causing traffic paralysis in Guillon, causing great difficulties for rescue and relief work as well as the travel of citizens. On the morning of August 4, when Premier Wen Jiabao was inspecting flood control and flood control work in Jilin City, he made a special trip to Wende Bridge to check on the disaster situation and ordered that this major artery of traffic should be blocked as soon as possible to restore normal traffic order. After more than 3 hours of tenacious struggle, 183 meters pontoon successfully completed. The Pontoon is a two-way two-lane bridge with a maximum carrying capacity of 50 tons of vehicles, which can reach the road transport capacity of the windward bridge before it crashes.

Hot Products

Small Span From 40m To 80m Steel Truss Bridge Compact Panel Bridge Small Span From 40m To 80m Steel ...
Designed Span 6-60m Deck Type Steel Deck/ Wood Deck Steel Truss Bridge Designed Span 6-60m Deck Type ...
54m Emergency Bridge Steel Truss Bridge Description of 54m Emergency Bridge Steel Truss Bridge 54m ...
Designed Load HL-93 Compact Panel Bridge Steel Truss Bridge Description of Designed Load HL-93 ...
Length 81m Design Load HS20-44 Steel Girder Bridges Description of Length 81m Design Load HS20-44 ...
1m Passenger Foot-Bridge Permanent Steel Girder Bridge Description of 1m Passenger Foot-Bridge ...