RFM Cold Rolling Forming Machinery |
Verified Suppliers
|
|
Process Sketch
Uncoiling → Alignment guiding roller → 9 rollers leveling → 315T hydraulic punching hole → Panel Transport table → Swift sheet feeding → Photoelectrical switch → Roller guiding table → 12 stations roll forming → Finished product support table.
Standard Equipment of Machine
1) | Manual uncoiler | 1set |
2) | 9 rollers leveling unit | 1set |
3) | 315T hydraulic station | 1set |
4) | Hydraulic station | 1set |
5) | 310 flat panel punching mould | 1set |
6) | Pin punch (and spare parts) | 22 units |
7) | Cutting blades(and spare parts) | 1pc |
8) | Middle support table (panel style) | 1set |
9) | Fast sheet feeding device | 1set |
10) | Fast feeding transducer | 1set |
11) | 12 forming stations | 1set |
12) | Support table | 1set |
13) | PLC console | 1set |
Profile Drawing
Technical Parameters
Material specification | Galvanized steel, cold rolled steel, and carbon steel. |
Thickness | 2.5 mm to 4.0mm. |
Main motor power | 80 kw. |
Dimension | 30m*4.5m*4.5m (length*width*height) |
Feeding width | 500mm. |
Cover width | 311mm. |
Roll forming Speed | 12 m/minute. |
Manual Uncoiler | Max. Capacity: 5000kgs. |
Voltage | As per customer's request. |
Numbers of stands | 12 stands/stations/pairs. |
Material of Main Equipment
Roller Material | Roller Material |
Active Shaft Material | High grade S45C carbon wrought steel, diameter 80mm. |
Electric Elements | PLC control console, touch screen and transducer, from Mitsubishi, Japan.Other elements, from famous suppliers of China. |
Cutter blades | Cr12MoV steel with quenched treatment, hardness HRC58~61,wear-resistance, good steel structure, long life. |
the machine naked in the container or packing as your required.
Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.
Delivery: within 45 working days after receipt of deposit
Guarantee: One year, and we will provide the technical support for the whole life.
FAQ:
1. How to get a quotation of guard rail machine?
Give me the profile drawing and thickness for the guard rail
machine,this is the important.
Other spicific requirements is welcome,such as the speed,power and
voltage you want.
2. Terms of payment:
30% T/T, Balance to be paid before shipping after inspection.Also
we accept the payment L/C, O/A , D/P.
3. How long the guard rail machinecould be made?
Normally speaking, guard rail machinecould be made without 45
working days. If you need roll forming machines in a hurry, we can
make it for you less than a month.
4. What is your after-sale service?
guard rail machinewarranty period is 12months,if the broken parts
can't be repaired,we can send new to replace for free,but you need
to pay the express cost yourself.we supply the technical support
for the whole life of the equipment.
5. You are trade company or factory?
We are trade company but we also have own factories. Building trade
company is just for exporting various types of roll forming
machines.
6. How to visit your company?
a. Fly to Beijing airport: By high speed train From Beijing Nan to
Cangzhou Xi (1 hour), then we can pick up you.
b. Fly to Shanghai Airport: By high speed train From Shanghai
Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.