Jiangsu Pucheng Metal Products Co., Ltd. |
Verified Suppliers
|
|
ASTM Q215 GR.A Carbon Steel Tube Seamless Pipe OD 40mm Wall Thickness 1.5mm For CFB
Product Description
Carbon steel piping is a durable material made from carbon steel, a steel alloy with iron and carbon. Because of its strength and ability to withstand stress, carbon steel pipe is used in a variety of heavy-duty industries like infrastructure, ships, distillers, and chemical fertilizer equipment.
Product Name | FFactory Supply ASTM A53 Gr A/B 80 6 Inch Round/Square s235jr 1045
1020 Carbon Seamless Ms Steel Pipe |
Standard | ASTM A106, ASTM A53, API 5L Gr.B, DIN17175,DIN1629 |
Outer Dia: | 20mm-610mm |
Wall Thickness | 4mm-70mm |
Dia Tolerance | Control with in the standard, OD:+-1%, WT:+-10% |
Materials | 10#,20#, 45#,16Mn,A106(B,C),A53(A,B),API J55,API
K55,Q235,Q345,ST35.8,ST37,ST42,ST45,ST52 |
Inspection | ISO,BV,SGS,MTC |
Packing | Waterproof paper, and steel strip packed. Standard Export Seaworthy
Package.Suit forall kinds of transport,or as required |
Supply Ability | 1000 metric tons/month |
MOQ | 5metric ton,sample order accepted |
Shipment time | Within 7-10 workdays after receiving deposit or L/C |
Payments | T/T,LC |
Capacity | 250,000 tons/year |
Product Detail
Application
Package & Shipping
Certification
FAQ
1. What are your company's main products?
Our main products are stainless steel pipe and plate, seamless
steel pipe, galvanized steel pipe,petroleum pipe, helical welded
pipe, wear resistant steel plate, cold rolled/hot rolled coil
steel, Angle steel, I-beam steel, H-beam steel, channel steel, etc.
2. Can I get some samples?
Yes, we glad to provide free samples for you.
3. Can we visit your factory?
Sure, we welcome you to visit our factory, check our production
lines and know more about our strength and quality.
4: Are you factory or trader?
Our company has been manufacturing and selling steel products for many years since 2009. We've gained our Export Right and become an integrated company of industry and trade in order to satisfy buyer's multi-request on different material and products.
5. How long is your delivery time?
Generally it is 7 days if we have the exact goods in our stock. If
not, it will take around 15-20 days to get goods ready
for delivery.