Home Companies Sussman Machinery(Wuxi) Co.,Ltd

Galvanized Steel / Blank Steel Door Frame Roll Forming Machine 12 - 15 Meters / Min

Sussman Machinery(Wuxi) Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.

Contact name:Spring Wu

Inquir Now

Sussman Machinery(Wuxi) Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Galvanized Steel / Blank Steel Door Frame Roll Forming Machine 12 - 15 Meters / Min

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

Door frame roll forming machine
 

 


 Technical Parameter
 

 

 ItemsSpecifications
Material of coilMaterial Thickness1.5-2mm
Un Coiler3 tons manual
Forming systemRolling Speed12--15 m/min
Roller Stations18 stations
Roller Material

45# Steel with quenching 50mm shaft

 

Maim Motor Power7.5 kw
Hydraulic cutting Power4 kw

Cutting

system

Material Of CuttingCR12 with quench treatment
HardnessHRC58-62
Tolerance+-0.5mm
Electrical control systemElectric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s require

Control SystemPLC (Panasonic) as list in the note
 WeightAbout 2.5 tons
 Way Of Drive1 inch single chain
 Size of machine

Length 4500mm* Width 600mm* Height 800mm

 

 

 


 Main Components
 

 

S.N

 

Equipment name

 

Quantity

 

1

3T passive un-coiler1 set

 

2

Servo feeder1 set

 

3

Leveling device1 set

 

4

Hydraulic punch for the notch and lock6 sets

 

5

Main roll forming machine1 set

 

6

Cutting holder1 set

 

7

Cutting blades1 set

 

8

Hydraulic station1 set

 

9

Control system ( including control box)1 set

 

10

Out tables

2 units

 

11

Spare parts1package

 

 


 
Working Flow of Roll Forming Machine


 

 
 

Profile of product

 

 

Factory price door-case steel door frame roll forming machine

 


After-sale Serive

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.


- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.


- Training time: 5 days.


- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.


-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
 

Hot Products

Automatic PPGI GI Perforated Cable Ladder Tray Manufacturing Machine With Cr12 Steel Technical ...
Galvanized Sheet Flexible Cable Tray Roll Forming Machine With PLC Control The advantages of cable ...
Cold Rolled Strip Cantilever Type Cable Tray Roll Forming Machine With Punching Machine Technical ...
1-2mm Galvanizing Steel Perforated Cable Tray Cold Roll Forming Machine With Hydraulic Cutting ...
Metal Profile Small Size Cable Tray Roll Formed Making Machine With Electrical Power 22kw Company ...
1.0mm-3.0mm Thickness Cable Tray Plank Roll Forming Machine/ Cable Tray Making Machine Technical ...