Jiangsu milky way steel poles co.,ltd |
Verified Suppliers
|
|
16m High Mast Steel Utility Pole Electric Power Poles Aluminum Conductor
Product Name | Hot Dip Galvanized Medium Voltage Steel Utility Pole With 50000m Aluminum Conductor |
Type | Straight Pole ,Tensile Pole ,Turn Pole |
Suit for | Electricity distribution |
Shape | Conoid ,Multi-pyramidal,Columniform,polygonal or conical |
Material | Usually Q345B/A572,minimum yield strength>=345n/mm2 |
Torlance of dimenstion | +- 2% |
Power | 10 KV ~550 KV |
Safety Factor | Safety factor for conducting wine : 8 |
Design Load in Kg | 300~ 1000 Kg appliced to 50cm from the to pole |
Marks | Nane palte through rivert or glue ,engrave ,emboss as per customer requirement |
Surface treatment | Hot dip galvanized Following ASTM A 123, color polyester power or
any other standard by client required. |
Joint of Poles | Insert mode,innerflange mode,face to face joint mode . |
Design of pole | Against earthquake of 8 grade |
Wind Speed | 160 Km/Hour . 30 m /s |
Minimum yield strength | 355 mpa |
Minimum ultimate tensile strength | 490 mpa |
Max ultimate tensile strength | 620 mpa |
Standard | ISO 9001 |
Length of per section | Within 14m once forming without slip joint |
Welding | We has past flaw testing.Internal and external double welding makes
the welding beautiful in shape |
Thickness | 1 mm to 30 mm |
Production Process | Rew material test → Cuttingj →Molding or bending →Welidng (longitudinal )→Dimension verify→Flange welding →Hole drilling →Calibration → Deburr→Galvanization or powder coating ,painting →Recalibration →Thread →Packages |
Packages | Our poles as normal cover by Mat or straw bale at the top and
bottom ,anyway also |
Before shipment ,we have a final inspector manager to check the
products on every detail and component to make sure it all meet the
drawing .
Trade Terms:
1. Payment:(1)Telegraphic Transfer(30% advance payment, balance before shipment)
(2)Telegraphic Transfer(30% advance payment, balance against copy of
documents)
(3)Letter of Credit: at sight
2. Lead Time: 2 weeks after confirmed order
3. Delivery way: by sea