Home Companies Qingdao Ruly Steel Engineering Co.,Ltd

Modular Industrial Steel Frame Structure Building Prefabricated Multi Floors

Qingdao Ruly Steel Engineering Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: Tieshan Industrial zone, Huangdao District, Qingdao City.

Contact name:steven

Inquir Now

Qingdao Ruly Steel Engineering Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Modular Industrial Steel Frame Structure Building Prefabricated Multi Floors

Country/Region china
City & Province qingdao shandong
Categories Metal Building Materials
InquireNow

Product Details

 

Modular Industrial Steel Frame Structure Building Prefabricated Multi Floors

 
1. The tensile strength of steel is much more times greater than concrete.
2. Steel is also ductile in nature.
3. Steel has also the high strength to weight ratio as compared to concrete.
4. Steel structures are also preferred when time span is small. Construction rate is very fast.
5. Steel bars are also reusable.
6. Steel structures can be extended in any direction.
 
Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure project. Our service include design, fabrication for all the steel structure components and insullation panel, installation on site.

Advantages of steel structures high rise buildings compared with concrete high rise buildings:

 

1Steel structural material has high strength and light weightThe steel structure has high strength. Compared with the concrete structure, the steel structure beam and the column cross-sectional area are small, which can increase the effective use area. Generally, the cross-sectional area of the high-rise steel structure column accounts for about 3% of the building area, and the cross-sectional area of the high-rise concrete structure accounts for 7%-9% of the building area.
2Steel structure construction speed is fastMost of the steel structure is produced in the factory and transported to the site for integral assembly by welding or bolting. It can be used all day, because the steel structure itself can be used as a load-bearing structure for the construction load to reduce the formwork during construction, thus not only reducing costs, but also greatly speeding up Construction speed. The construction speed of the steel structure is about 1.5 times that of the concrete structure.
3Convenient pipeline layoutIn the structural space of the steel structure, the truss type member or the member having the cavity can be used, so that the arrangement of the pipeline is convenient, and the replacement and repair of the pipeline is convenient. However, if a concrete structure is used, the beam should not be opened, and the pipe generally passes under the beam, thereby occupying a certain space. In the case of the same floor height, the floor height of the steel structure can be smaller than the floor height of the concrete structure, which can reduce the area of the outer wall.
4The steel construction environment is less pollutedWhen steel structure is constructed, sand, stone, soil, cement and other materials are rarely used, and pollution problems such as dust flying, waste accumulation and noise are avoided from the root wood.
5Steel structure construction conforms to sustainable development policyThe steel structure industry is a green-bag environmental protection construction industry. Its utilization of resources and energy is relatively reasonable, and has little damage to the environment..

 

Our steel structure fabrication factory:

The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

 

Our services:

We can design and fabricate customized steel structure components for light and heavy steel structure buildings in protal frame and dome frame, such as warehouse, workshop, storage, hangar, chicken shed, steel shed for market and ground parking, supermarket , high rise steel office buiding, factory , plant, exhibition hall, gym, dormitory building, oli&gas, power station, infrastructure buildings, etc.

 

Packing and transport:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

Hot Products

Single Layer Prefab Steel Structure Warehouse Glass Wool Sandwich Panel Project Information: Steel ...
Prefabricated Steel Structure Warehouse/Steel Structure Machinery Industrial Park Project informatio...
Long Span Steel Structure Warehouse Pre Engineered Steel Structure Project information: Long Span ...
Steel Structure Granary/Prefabricated Steel Structure Warehouse Project introduction: Steel ...
Prefabricated Steel Structure Beer Processing Plant/Steel Structure Warehouse With Eps Sandwich ...
Steel Structure Food Processing Plant/Galvanized Prefabricated Structural Steel Buildings Prefabrica...