16Ton Double Girder cabin control Electric overhead traveling
Casting Crane
Product Introduction:
QDY Double Girder Cabin Control Electric Overhead Traveling Casting
Crane is mainly used at the place where the molten metal is lifted,
it is the main lifting and transportation equipment in the smelting
workshop of the steel plant, and is used to lift and transfer and
pour molten iron in the smelting process, the thermal—protective
coating is added at the bottom of the main girder.
Double girder cabin control electric overhead traveling casting
crane mainly consists of bridge frame, long traveling unit, hook
and wirerope and lifting trolley, cable,cabin and electric control
system,etc.
It has reasonable structure, robust , smooth running,soft starting
low noise, low cost maintenance,long service life.
Normal capacity are
5t,10t,16t,16/3.2t,20/5t,32/5t,50/10t,74/20t,100/32t,125/32t,140/40t,160/50t,etc.
the span is 10.5~31.5m, lifting height 16-20m, working class is A7
or A8.
Control model: cabin control.
Ambient temperature normally up to 60ºC
The casting crane transports ladles filled with molten steel to the
basic oxygen furnace (BOF), or molten steel from the BOF and
electric arc furnace to the continuous casting machine. It can also
be used for teeming and casting.
Since Casting overhead cranes is used to transport molten steel,
thus safety and reliability come first with this crane.
Main features:
1, Casting Overhead crane has very special safe design,it uses two
pcs of wire rope system for the main hook, the device is called
Balance Arm, any each wire rope is damaged or broken,the other
wirerope will safely hold the ladle in the air and wont let it fall
down,then to avoid accident.
2, Anti high temperature design, there is heat proof layer on
bottom of main girder.
3, Main hook and Aux.hook all have two sets of brake,more safety.
4, Safety monitor is provided to monitor each motion,all data, i.e
current,moving speed,are displayed in the cabin,operator can see it
clearly.
5, In addition, Safe hydraulic brake is installed onto the flange
of the wirerope drum, one more layer of safety guarantee.
6, Motor is with high protection class IP54,IP55, with overspeed
switch,overheat protection,fan cooling,motor encoder is optional.
7, Emergency stop system
8, Over current Protection, Short-circuit Protection
9, Phase sequence protection.
10, Zero position protection.
11, Voltage loss protection.
Technical Parameters of Double Beam Electric Overhead
Traveling Casting crane :
Lifting weight(t) | 5 | 10 | | 16/3.2 | 20/5 | 32/5 | 50/10 | 74/20 |
Span(m) | 10.5~31.5 |
Max Lifting height(m) | 16 | 16 | Main hook | 16 | 12 | 16 | 12 | 22 |
Aux.hook | 18 | 14 | 18 | 16 | 24 |
Working class | A7 | |
Speed (m/min) | Hoisting | 15.5 | 10.4 | Main hook | 10.7 | 9.8 | 7.8 | 7.8 | 6.1 |
Aux.hook | 14.6 | 15.5 | 15.5 | 10.4 | 9.7 |
Traveling of crab | 37.2 | 43.8 | | 44.6 | 44.6 | 42.4 | | 33.8 |
Traveling of trolley | 92.7 | 92. 7 | | 76 | 76 | 89 | 75 | 67.3 |
Motor (type/kw) | Hoisting | 15 | 22 | Main hook | 37 | 45 | 55 | 75 | 90 |
Aux.hook | 11 | 15 | 15 | 22 | 37 |
Traveling of crab | 1.5 | 2.2 | | 3.7 | 3.7 | 7.5 | 11 | 15 |
Traveling of crane | 2*5.5 2*7.5 | 2*5.5 2*7.5 | | 2*7.5,2*11 | 2*7.5, 2*11 | 2*11 | 2*11, 2*15 | 2*22 |
Steel track | trolley | 18kg/m | 24kg/m | 43kg/m |
crane | 43kg/m | 43kg/m or QU70 | QU70 | QU80 | QU100 |
Power source | 3Ph A.C 50Hz 380V |