Zhengzhou Jinghua Industry Co.,Ltd. |
Verified Suppliers
|
|
Potato Starch Making 3500 Kg Cage Cleaning Machine Potato Dry Sieve Desand Plant
1.Description of potato starch making machine
Cage washer is mainly used for dry sieving before potato cleaning,Stone removal effect is good, can effectively save water in the cleaning process.Widely used in sweet potato starch, canna starch, cassava starch, potato starch production lines.
Advantages of cage cleaning machine
1.Fully stainless steel to be sure there is no corrosion
2. Inner spiral is adopted to guide material which going under the
pushing.
3. Simple structure low power consumption, big capacity, well
cleaning result
4. Stable operation and low damage to be profitable for starch
extraction.
Main technical parameters
Model | Drum diameter (mm) | Drum speed (r/min) | Drum lenght (mm) | Power (Kw) | Weight (kg) | Capcity (t/h) | Dimension (mm) |
GS100 | 1000 | 18 | 4000-6500 | 5.5/7.5 | 2800 | 15-20 | 4000*2200*1500 |
GS120 | 1200 | 18 | 5000-7000 | 7.5 | 3500 | 20-25 | 7000*2150*1780 |
There are four steps to making starch
1.Cleaning:To remove the stone sand and from the raw material ,and peel it.
2.Crushing :To destroys the fiber structure and makes the starch particles free.
3.Separator:To removing sand ,mud from starch slurry, degreasing, microslag separation, protein separation, washing and concentration of all kinds of starch and modified starch emulsion.
4.Drying and Packing:To dehydrator the wet starch, sifter and packaged.
2.Our Service
Pre-sale service
1.Introducing detail features and application of the products to
customer.
2.Selecting economical and practical machines for customer.
3.Providing operation data of the related machine.
4.Providing means of trial performance for customer.
5.Flow chart and factory designing layout .
Sale service
1.Recommending engineering conditions required for installation of
the machine.
2.Communicating the manufacturing progress of machines with
customer in time.
3.Project planning and design services.
After-sale service
1.Training of equipment maintenance and operating personally.
2.Installation and commissioning of equipment until everything is
functional.
3.One year warranty and providing long-term maintenance service and
spare parts.
4.Giving technical support to customer for developing new product.
5.Engineers available to serve machinery overseas.
3.Packing & Shipping
Packing & Shipping: Customize the wooden case according to the size of the product.
Delivery: 14 days after receiving pre-payment (on time according to contract strictly).