Food grade SS304 and SS316L stainless steel sanitary rotor pump
with console and hopper
First, notice before starting:
Check the oil quantity in the gear box is normal, observe the
transparent oil mark, the oil stock is suitable for the oil mark
window half, the lubricating oil should be replaced regularly, in
general, after 4000 hours of operation, it should be replaced.
Before starting, open all the inlet and outlet valves of the pipe.
When the medium flows into the cavity, there is no abnormal
movement after the pump is rotated with the hand. Then the pump
will start to move first. After the pump is turned and the medium
is flowing, the official operation is started, and the empty pump
is strictly prohibited. When the pump reaches the normal speed,
Observe the pressure index of the pump.
When the pump installation location has suction requirements, fill
the inlet pipe and pump cavity of the pump.
When the process requires the heating or cooling of the medium, the
heating or cooling device should be opened before the pump is
opened. The heating energy is opened 10 minutes in advance, and
then the pump is opened.
The mechanical seal pump equipped with cooling water must open the
cooling water before starting the machine, and ensure no
interruption after startup. Otherwise, the mechanical seal will be
damaged immediately.
Two. Operation
1. During the operation of the pump, attention should be paid to
the power of the motor and the operation of the pump.
2, the mechanical seal should not leak and heat.
3. Pump with packing seal shall allow 1~3 drops per minute, such as
increased leakage, slightly pressed material ring, no need to
disassemble and assemble.
4. When the mechanical stepless transmission is used, the speed
control is gradually adjusted according to the speed of the digital
display, and the speed control disc is strictly prohibited when the
machine is stopped. Otherwise, the non - pole reducer will be
damaged.
5, the use of frequency converter can use manual frequency
modulation and automatic control two ways.
6, often check the pump and motor heating, when the pump is in the
state of water cooling, the temperature rise of the bearing is 40
degrees. When the pump is in the hot water insulation state, the
temperature of the bearing housing is allowed to be higher than
that of the pump body at 30 C.
7, the valve can not be adjusted by the inlet pipeline to avoid
cavitation and pump vibration.
8, when the pump is running, it is strictly prohibited to close the
inlet and outlet valves.
Three. Stop
1. Stop the pump and close the inlet and outlet valve.
2, after the pump has been discontinued for a long time, it should
first turn the coupling with the hand before starting. The handle
has resistance, but it can rotate at will and the weight is
uniform. And notice whether there are friction and foreign objects
in the pump.
3. When the pump and deceleration motor are relocated, the
coaxiality of the pump shaft and the motor shaft should be checked,
and the outer and the left and right parts of the shaft of the
coupling shall not exceed 0.1mm, otherwise the vibration of the
pump will be caused, and the life of the spindle will be affected.
Max Flow | 62m³/h / 272GPM | ||
Seal / Gasket | EPDM | ||
Motor | ABB Motor / Local Motor | ||
Power | 0.55kw ~ 22KW | ||
Voltage | 110V / 220V / 380V | ||
Frequency | 50HZ / 60HZ | ||
Max Pressure | 12 Bar / 174 Psi | ||
Surface Polish | Inner polished & sandblast outside | ||
Machine Processing
| 27 Sets Advanced CNC Machine | ||
Service | OEM / ODM | ||
Delivery | By Sea / By Air / By Express | ||
Payment Terms | 100% TT / 50%TT in advance, balance 50% before delivery |
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is
15-20 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: No.
Q: What is your terms of payment ?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 50%
T/T in advance ,balance before shippment.
Packaging & Shipping
Wooden box ,shipping by sea or air.
Warranty time: one year, from the date which the product is
qualified commissioning. Any damage except the wrong operation
during warranty period is repaired freely. But the travel and hotel
expenses should be count on buyer.
Training services: our engineers will train your staff to operate
it during the period of installation and commissioning, and they
will not leave there until your staff can operate it properly and
normally.
Maintenance services: any malfunction happened, once you enquiry
us, we will reply you within 48 hours except the special reasons.
Lifelong services: we provide lifelong services for all the
products we sold out, and supply the spare parts with discount
price.