Hefei Jinguoyuan Vision Technology Co., Ltd. |
Verified Suppliers
|
|
12 Lanes 4 Tons Capacity 98% Accuracy Chestnut Sorting Machine
Product Introduction
The 12-Lane Advantage in Chestnut Sorting
Embark on a journey of capacity optimization with our Chestnut
Sorting Machine's 12-lane configuration. Uncover the benefits of
this high-capacity option, designed specifically to cater to
large-scale processing demands. From enhanced throughput to
unparalleled efficiency, explore how the 12-lane advantage
positions our machine as the ideal solution for businesses with
extensive production needs. Dive into the logistics of managing
multiple lanes simultaneously, ensuring a seamless and controlled
sorting process even at peak production volumes.
Material Sorting Effects
Product Specification
No. | Lanes | Output (t/h) | Voltage (V/Hz) | Power (kW) | Air Pressure (MPa) | Air Consumption (m3/min) | Dimension (LxWxH mm ) | Weight (kg) |
LJG04-1208B | 12 | 2 | 380/50 | 6 | >0.6 | 5 | 9276*3662*2004mm | 4250 |
Remarks: The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Due to chestnut sorting machine is very large, usually it will
be module packed with large durable pallet and covered stretch film
to ensure good condition during long-term ocean shipment. For other
small parts, they're packed into multi-layer corrugated boxes.
All packages is aimed to protect the machine from any damaged
during the complicated shipment.
Warranty
We provide 1-year warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our chestnut or not?
Can you send a process video?
A: We accept chestnut samples and take videos during real
processing, so you will have an obvious look at the effect to our
dates sorting equipment. In addition, your visit to our
manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after
contract signed and deposit received, namely after our
proposal is agreed to cater your actual demands.