WUHAN RADARKING ELECTRONICS CORP. |
Verified Suppliers
|
|
Three Phase Power Quality Monitoring Equipment KWH Meter LCD Display Electric Meter
Functions and Features:
1. 35mm DIN rail standard installation, comply with DIN EN
50022 standard.
2. 7 pole width (Modulus 125mm), comply with DIN 43880
standard.
3. The total electricity consumption and the real-time
consumption could be measured. The real-time electricity can be
cleared by the buttons on the panel, which clearance event is
protected by password
4. 8 numbers LCD screen with white backlight 6 + 2 format,
optional display 8 + 0 (9999999kWh).
5. With self-diagnostic test,and LCD alarm function.
6. Built-in clock and maintenance-free backup lithium battery, the
battery capacity can displayed in real-time. The data of the
electricity will be stored after a power failure
7. Compatible with a variety of communication protocols,
including DL/T645-1997,DL/T645-2007,MODBUS-RTU,IEC62056-21 C Mode.
8. The relay can be cut off by remote. The meter will control
the reply by the single send from the network, cut off the
electricity load of the user.
9. Measure the maximum demand, real-time voltage, current,
power factor, frequency, active power, reactive power, apparent
power and so on.
Technical Parameters:
|
Application:
Model RDK100TC three phase electronic DIN rail active energy meter is a kind of newest 3P4W/3P3W electric meter to measuring the active energy, it adopt micro-electronics technique, and imported large scale integrate circuit, using advanced technique of digital and SMT techniques, etc.
The meter meets relevant technical requirements of class 1 three phase active energy meter stipulated in international standard IEC 62053-21..
It can display total energy consumption by LCD with backlight.
With following features such as: good reliability, small volume, light weight, specious nice appearance, convenient installation, and etc, the meter is widely used in any occasions.
Safety precautions:
* Use only isolated tools.
* Place the meter only in dry surroundings.
* Make sure the AC wires are installed correctly before activating the current/voltage.
* Never break the seals or open the front cover as this might
influence the functionality of the meter.
* Do not through, drop, kick or other physical violence to the meter
as there are high precision components inside that will break or
make the meter measure inaccurate.
* Do not mount the meter in area's with harm gas, dust, mildew or
insects or on unstable surfaces.
Company Introduction:
Wuhan Radarking Electronics Corp. is a modern share enterprises
which focusing on the smart Internet of things(IOT) /smart grid
energy consumption sensor/intelligent electric safety integrated
solution. It established in 2002(former name: Wuhan Radarking
Co.,Ltd.)and went public on January 27, 2015 with the stock
abbreviation RADARKING and stock number 831722. It owns the
independent R&D center and factory which is the key recommended
high-tech enterprises in Wuhan city.