Home Companies HORIZON FORMWORK CO., LTD.

Zinc-Plated Adjustable Steel Builders Prop 5m Height For Slab Formwork Concrete

HORIZON FORMWORK CO., LTD.
Active Member

Contact Us

[China] country

Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA

Contact name:H. Chang

Inquir Now

HORIZON FORMWORK CO., LTD.

Zinc-Plated Adjustable Steel Builders Prop 5m Height For Slab Formwork Concrete

Country/Region china
City & Province xingtai hebei
Categories Scaffoldings
InquireNow

Product Details

Zinc-Plated Adjustable Steel Builders Prop 5m Height For Slab Formwork Concrete


With the prop’s high loading capacity, low weight and stability, HORIZON slab formwork works safely and efficiently on site as well as cost-effective.

Also, the prop is fast and easy for handling on site.

 

Height Range

Outer tube(mm)

Inner tube (mm)

Thickness (mm)

Adjusting device
1.7m-3.0m60 / 57 / 4848 / 401.6-4.0Ext. thread / Int. thread
2.0m-3.6m60 / 57 / 4848 / 401.6-4.0Ext. thread / Int. thread
2.2m-4.0m60 / 57 / 4848 / 401.6-4.0Ext. thread / Int. thread
2.5m-4.5m60 / 57 / 4848 / 401.6-4.0Ext. thread / Int. thread
3.0m-5.5m60 / 57 / 4848 / 401.6-4.0Ext. thread / Int. thread


Advantages:
1. High quality steel tubes ensures its high loading capacity.
2. Various finishing are available, such as: hot-dipped galvanization, electric-galvanization, powder coating and painting.
3. Special design prevents the operator from hurting his hands between the inner and outer tube.
4. The inner tube, pin and adjustable nut are designed protected against unintentional disengagement.
5. With the same size of the plate and base plate, the prop heads (fork heads) are easily to insert in the inner tube and outer tube.
6. The strong pallets ensure the transportation easily and safely.


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.


Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 

Hot Products

Horizontal Slab Formwork Systems , Movable Table Form For Concrete Slab HORIZON’s slab formwork ...
Flexible Handrail Post 1.5m for Slab Formwork System Safe Working Protection As protection against ...
Steel Prop Supporting Head In Slab Formwork Systems To Hold Timber Beams Steel prop supporting head ...
Four-Way Fork Head For Supporting H20 Beams In Slab Formwork Systems The Fork Head serves to keep ...
Removable Steel Folding Tripod For Holding Shoring Props in Slab Formwork System The removable ...
Adjustable Guardrail Post For Safe Working Protection In Slab Formwork System As protection against ...