Waste Recycling Plastic Paper Double Shaft Shredder Machine Blades
Production Process
- Blanking---choose materials according to customer requirements.
- Forging--Forging is mainly to increase the density of the material.
- Annealing-to lower the temperature for processing.
- Finishing-mainly processing the material into shape.
- Inspection---inspect whether the product is consistent with the
drawing sample.
- Quenching-improve the corresponding hardness of the molded product
and material.
- Annealing--In order to increase the wear resistance of the product,
it must be annealed for a long time.
- Quenching and tempering-mainly the parallelism of quenched and
tempered products to facilitate processing.
- Coarse grinding-rough grinding of each surface of the product.
- Precision grinding-super precision grinding, mirror grinding,
improve the accuracy and parallelism of the product.
- Inspection-Let unqualified products refuse to flow into the market.
- Packing--different packing according to different products.
Main feature:
- Easy and fast cutting, sharp edge.
- Long lifespan and stable performance
- Good cutting result and high efficiency
Specifications:
Size | 34*34,40*40, 42*42, 45*45 mm and many more size |
Material | D2 1.2379, high alloy tool steel |
Hardness | 58-60 HRC |
Tolerance | Exceed OEM specification |
OEM Service | Available |
Packing | Wooden boxes, standard export packaging |
Application | Shredder blades for Plastic, Rubber, Metal, Waste Recycling |
Delivery time | 30 days after deposit be received |
FAQ:
1. Q: How do we know that you are a manufacturer under this special
period?
A: We can make a video call any time to show you our actual
factory.
2. Q: Can I get a special design for my products?
A: We have our R&D department offering customization services
for our customers.
3. Q: Are you a factory or a trading company?
A: We are a professional factory who gets 20+ years of professional
experience
4. Q: How long is your delivery time?
A: 1 set for normal standard machine needs about 3-7 working days.
For 1 or more containers, needs about 20-30 working days.
5. Q: How long is your warranty?
A: Within 1 year from the date of the factory, if parts are a
failure or are damaged the cause of a quality problem (except
wearing parts), we provide these parts for free.
6. Q: What is your payment term?
A: T/T 100% before shipment, L/C at sight, western union or Trade
Assurance order recommended.