Shanghai Strong Metal Production Co., Ltd. |
Verified Suppliers
|
|
Custom Brushed Panel Aluminum Stainless Steel Stamping Sheet Metal Fabrication Company
1 What does "Metal stamping" mean?
NC numerical control blanking, NC blanking first to write numerical control processing program, using programming
the software will draw the expansion diagram written into NC number pulling machine tool can identify the program, let
according to these programs step by step on the plate punching the shape of the plate, but its structure by the tool
structure, low cost, and accuracy in 0.15.
2 Technical Parameters
Product name | Custom Brushed Panel Aluminum Stainless Steel Stamping Sheet Metal Fabrication Company |
Name | Automotive Stamping Parts Sheet Metal Robot Welding Sheet Metal Stamping Bending Fabrication |
Type | OEM Parts, Stamping Hardware Part, sheet metal |
Color | Customized, Customized Aluminum Alloys, Custom |
3 Product Details
Use: Car
Function: structure part of a car door, and use it to connect
different metal parts.
Technology: metal stamping, punch press, powder coating
4 About Strong
Strong has many advanced production equipments: 50+ punch press machines (highest 1000 ton),
20+plastic injection machines (highest 740ton), 20+ bending machines (highest 600 ton), 20+ automatic
welding arms, 50+ welding working tables, 8+ laser cutting machines, and a 400m powder coating line,
etc. In terms of the QC testing tool,
Strong metal was established in June 2003 with a total registered capital of 67 million yuan and a total
construction area of 30,000 square meters. It has 5 factories in total which are located in Nantong,
Taicang, Nanjing, Vietnam, and Shanghai.
5 FAQ
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is
15-20 days if the goods are not in stock,
it is according to quantity.
Q: Are you a trading company or manufacturer?
A: We are a manufactory.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay
the cost of freight.
Q: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance
before shipment.
If you have another question, pls feel free to contact us.