Product Description:
Its base material is HDPE, both sides are covered with
self-adhesive layer, and faced with removable silicone-coated film
as isolation layer. For special construction conditions, geotextile
can be compound on polymer layer, it can bond with concrete layer
tightly. After Membrane bonding with concrete, water can be blocked
between membrane and concrete, which can improve the reliability.
Pre-applied Waterproofing Membrane MILE is composed of HDPE sheet,
one special pressure sensitive adhesive, and artificial granule
covering layer.
Membrane sizes
thickness | width | roll length |
1.2mm,1.5mm,2.0mm | 1.0 meter | 20 meters |
Technical date sheet:
No. | Items | JL 1 | JL 2 |
1 | Tensile Strength | Tension, N/50mm | ≥500 | ≥800 |
Breaking Elongation, % | ≥400 | - |
2 | Tear Strength, N | ≥400 | ≥200 |
3 | Impermeability, 0.3Mpa, 30 minutes | No leaking | No leaking |
4 | Low Temperature Flexibility | -25℃ | -35℃ |
5 | Thermal Stability | Appearance | No Distortion |
Size, % | ≤2.0 |
6 | Hot Air Aging (70℃, 168 hours) | Tensile Retention | ≥90% |
Breaking Elongation Retention | ≥80% |
7 | Peeling Strength with post casting concrete, N/mm | No treatment | ≥2.0 |
Cement, Sands surface | ≥1.5 |
Ultraviolet Radiation Aging surface | ≥1.5 |
Hot Aging surface | ≥1.5 |
Product Effect :1.The membrane can be fully bond to poured concrete.2.The membrane can be fully bond to poured concrete. Features:1)Good weather fastness and dimensional stability. 2) Combined concrete and waterproofing membrane closely. 3) Higher tensile strength and better extensibility under normal
construction conditions. 4) Easy installation, solid joint, and no environmental pollution. 5) Good rooting penetration resistance. How to apply Mile pre-applied waterproof membrane: Step 1, Clean the basement, make sure no sharp stones. Step 2, Unfold the membrane on the basement. Step 3, Overlap width should up to 8cm to ensure enough adhesive
strength. Step 4, MILED-150 (Reinforced double side tape) is helpful for
overlap.
Step 5, Some Details Treatment - inside and outside corners. Step 6, Some Details Treatment - pile head and anchor rod. Step 7, Some Details Treatment - pinhole fix (use MILET-150 sandy
tape). Our service:
1, One stop service from design of waterproofing system,materials
providing to technology support.
2, It is free for design and technology support of waterproofing
system.
3,supplying most accessories of waterproofing system,such as,self
adhesieve tape,sealants,prefabriated parts.
Storage and Transportation:
1) Package in plastic bag.
2) stored in well-ventilated place
3) Avoid direct sunshine, rain, keep ventilated.
4) be put horizontally no more than five-level