Slip Resistant Seamless PVC Flooring , Non Toxic Indoor PVC Flooring

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

Anti-Slip Indoor PVC Flooring For Sports Courts Floor Construction Coarse Mesh

 

Product Details

 

DESCRIPTION
STANDARDREQUIREMENT
UNIT
TEST RESULTS
ThicknessEN 428-mm3.5-8
Abrasion resistanceEN ISO5470-1<1000mg<350
Ball bounceEN 12235>90%>90
Impact resistanceEN 1517>80N/m>8
Fire ratingGB 8624-2012--B1(C-s1, t0)

 

Introduction to PVC surface layer

 

Internationally recognized PVC courts are made of 100% brand new material, free from DOP, heavy metals, and zero methanol;

 

Conforming to EU testing standards, adsorption factors were added during the production process, resulting in TVOC emissions less than 100 μ G/m ³, No harm to the human body; Easy maintenance in the future;

 

It is suitable for indoor Basketball court, tennis court, volleyball court, badminton court and other professional competition venues.

 

Product characteristics:

 

(1) Good weather resistance, water resistance, high density, good stability, good wear resistance, and professional slip resistance;

 

(2) Super strong stability, the floor does not shrink or deform;

 

(3) Anti bacterial and antibacterial treatment to inhibit mold growth;

 

(4) Good resilience while better protecting athletes' ankle and knee joints;

 

(5) Suitable for concrete and asphalt foundations.

 

 

Preparation for PVC floor adhesive installation

 

1. Technical preparation

 

(1) Carefully familiarize and review the floor construction drawings.

 

(2) Clarify the construction content and analyze the characteristics of the project.

 

(3) Provide technical clarification to the operators regarding the requirements for the exhibition hall floor.

 

2. Tool preparation

 

Main tools: serrated scraper, drum, cutting tool, oil brush, cutting blade, scissors.

 

3. Labor preparation

 

Due to the professionalism of PVC flooring installation engineering, a fixed professional team is used for construction and installation. The members of the team have years of experience in flooring construction to ensure the quality of the project construction.

 

4. Material preparation

 

(1) The floor material of the project is PVC coiled material: the board surface is required to be flat and smooth, without cracks, uniform color, consistent thickness, and meet the design requirements and relevant Technical Standard Order.

 

(2) The adhesive is required to be quick drying, high adhesive strength, strong water resistance, environmentally friendly, non-toxic and water-based adhesive, and comply with relevant Technical Standard Order.

 

(3) Material transportation, inventory needs to be stored vertically
It should not be placed flat or overlapped to avoid deformation of PVC rolls. It should not be stored in damp or sunny places to avoid discoloration and uneven color of the board surface. The adhesive should be stored separately, fireproof, and protected from sunlight exposure.

 

Installation method of PVC floor adhesive:

 

(1) First, polish and clean the ground base to remove dust.

 

(2) Apply the adhesive evenly on the base layer surface with a toothed scraper, and lay the boards in sequence from the inside to the outside. After laying a construction surface, use a roller or push plate to compress and compact it.

 

(3) After the board is laid, determine the dryness of the cleaning agent based on the temperature, and then proceed with welding of the board joints.

 

(4) Use a V-shaped trenching machine to start digging to 2/3 of the floor thickness from the center of the connecting line. Cut off the welding rod based on the length of the joint. Connect the power supply and preheat the welding machine to 200-220 ℃. After preheating, insert the welding rod into the welding machine and weld the 3mm welding rod at a pressure of 2kg/cm2 starting from the top of the joint.

 

(5) After the welding rod cools down, use a shovel to cut the excess welding rod above the board surface flat. During operation, be careful not to damage the floor surface.

 

(6) After the adhesive is fully bonded, the first maintenance should be carried out immediately. After completion, thoroughly clean or use a vacuum cleaner to remove all residue from the ground. Do not use the site within 24 hours after completion.

 

Use and maintenance of indoor PVC flooring:

 

1. Precautions for daily use of PVC flooring:

 

(1) PVC flooring is an elastic flooring that is different from other hard flooring. Sharp objects should be avoided from scratching the floor surface and dragging heavy objects to avoid scratching the floor surface.

 

(2) In situations where the external environment is dirty, it is best to place a shoe mat at the entrance to reduce contamination and wear on the floor, while also providing convenience for cleaning.

 

(3) Do not use soap powder and detergent to clean the floor, as this will not effectively clean the floor, and the saponified substance on the back is more likely to retain dirt.

 

(4) Do not place solvents such as strong acid, strong alkali, toluene and Lacquer thinner on the floor surface.

 

2. Daily cleaning and maintenance of PVC flooring:

 

(1) Dry cleaning method: You can use a dry mop to clean the floor, and if you encounter stains that are difficult to remove, you can use a detergent to assist in removing them.

 

(2) Wet cleaning method: clean the floor with a floor mop that wrings out the water, and add Floor cleaning to the water to enhance the cleaning effect. It is not allowed to wash the stone floor with a large amount of water.

 

(3) Sharp scratches can be gently polished with fine sandpaper to remove the scratches, then waxed and polished.

 

 

Certifications
FAQ
 
Q:What is the Production time?
A:It is about 7-15days.

Q:What are the options for the base construction of a sport court.?
A:The ground is based on asphalt or concrete.

Q:What is the life Span for Sport Court Flooring?
A:The life span is about 10-15years.

Q : What is the MOQ of the flooring Materials?
A : The MOQ is 1sqm, we have in stock.

Q : Can the flooring materials be used indoor or outdoor?
A : Yes, it can be used indoor and outdoor.
 

Hot Products

*, *::before, *::after {box-sizing: border-box;}* {margin: 0;}html, body {height: 100%;}body {line...
Integrated Semi-Prefabricate Running Track for Customized Projects and Solutions Product Description...
Customized Sandwich System Running Track Effortless Installation Black Technical Parameters: Product ...
Rubber Sandwich System Running Track with Excellent Weather Resistance Product Description: Sandwich ...
Fast Installation for Customized Prefabricated Running Track Sandwich Running Track Technical ...
Low Maintenance Sandwich System Running Track with Excellent UV Resistance Product Description: ...