Topland Oilfield Supplies Ltd |
Verified Suppliers
|
|
Forged Piston Rod Clamp Assembly For Oilfield Mud Pump Spare Parts
Topland supplies a wide variety of mud pump , like Bi-metal liner,
Ceramic liner, mud pump piston, valves and seats, piston rod,
extension rod, piston rod clamp, sealings and so on.
Mud Pump Spare Parts Clamp assembly functions mainly in connecting the intermediate draw
bar in power end system and the piston rod in hydraulic system in
the hydraulic end system of the well-drilling slurry pump. It is
forged and processed from 35 CrMo .The clamp is applicable to the
requirement of high pump pressure in the oilfield and first class
technology of well drilling. It is widely used in the oilfield,
industrial and mining enterprises for well drilling, well
repairing, etc. there are kinds of
standards of the diameter for your choice
WEATHERFORD MP10 Mud Pump Spare Parts List
CROSSHEAD ASSEMBLY | MODULE ASSEMBLY | ||
908378 | ROD, CROSSHEAD EXTENSION | 1124947 | COVER, VALVE |
1280237 | BAFFLE | 1124954 | GUIDE, VALVE UPPER |
1124882 | GASKET, WIPER BOX | 1124984 | RETAINER, UPPER VALVE |
1124881 | BOX, WIPER | 1317792 | SEAL, VALVE COVER |
1317770 | SEAL, OIL DOUBLE LIP 4.5X5.5X0.50 | 1124935 | RING, THREADED |
1124885 | O-RING, WIPER BOX 140 X 7HNBR | 1317644 | SEAL, CYLINDER |
1123534 | SPRING, WIPER BOX | 1124948 | CAGE, LINER |
1124901 | RETAINING, RING | 1124938 | PLUG, CYLINDER HEAD |
1124906 | BOLT, EXTENSION ROD | 1124936 | HEAD, CYLINDER |
1280249 | CAPSCREW 3/8" - 16UNC X 1-1/2" | 1317030 | MODULE, STUDDED |
PISTON ASSEMBLY | 1124955 | GUIDE, LOWER VALVE | |
1317936 | CLIP PIN, LOWER VALVE GUIDE | ||
1124994 | ROD, PISTON | 1317356 | LINER 6-1/2" |
1133856 | NUT, PISTON ROD (2700034) | VALVE ASSY | |
1316936 | CLAMP, PISTON ROD | 1318053 | VALVE ASSY. WITH INSERT FULL OPEN |
1149771 | BOLT, ROD CLAMP | 1317993 | INSERT, RUBBER FULL OPEN |
766945 | SEAL, PISTON HEAD | 1318028 | SPRING, VALVE CS |
1317585 | PISTON ASSY., COMPLETE 6-1/2" NITRILE | 1318008 | SEAT, VALVE FULL OPEN |
1317530 | RUBBER, PISTON REPLACEABLE 6-1/2" NITRILE | 13178756 | HEAD, PULLER |
Piston Rod Clamp Assy Suitable For Mud Pumps: | |||
EMSCO | F-350, F-500, F-650, F-800, F-1000, F-1300, F-1600, FB-1300, FB-1600, FC-2200,D-300, D-375, D-500, D-700, DA-500, DA-700 | ||
BOMCO | |||
GARDNER DENVER | PAH, PJ8A, TEE, PZ-7, PZ-8, PZ-9, PZ-10, PZ-11 | ||
IDECO | T-500, T-800, T-1000, T-1300, T-1600 | ||
NATIONAL | JWS-400, 7-P-50, 8-P-80, 9-P-00, 10-P-130, 12-P-160, 14-P-200, 14-P-220,K-500, K-500A, K-700, K-700A | ||
OILWELL | A-350-PT, A-560-PT, A-600-PT, A-850-PT, A-110-PT, A-1400-PT, A-1700-PT | ||
UNBT | 8T-310, 8T-650, BRN-1, NBT-600, UNB-600, UNBT-950, UNBT-1180, UNBT-1180L | ||
QZ/LS | 3NB-800, 3NB-1000, 3NB-1000C, 3NB-1300, 3NB-1300C, 3NB-1600 | ||
WIRTH | TPK1000, TPK1600, TPK2000 |
FAQ
1. Who are we?
Topland is an integrated supplier established in 2008. We are a
global group of oilfield supplies with excellent teams in more than
5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC
etc.
2. How can we guarantee quality?
Always a double requirements and drawing checking before the
production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and
natural gas industries. Like Rig Components, Drawworks Spare parts
and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control
Equipment, Drilling and Fishing Tools,Wellhead Control
Equipment,Drilling Accessories, Cementing Equipment and Tools etc.
4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win
Cooperation
4-2. Fast Quote, Competitive price & within shortest lead time
4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.
4-2. Order tracking service
5. How is the packing?
All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.
6. What is your terms of payment?
A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.