Professional Produce 1000kw dummy load bank for testing generator
Product Description
The system consists of 1 sets of AC400-1000KW load bank. The
system is made up of two parts of measurement and control and load,
mainly including the tank dry type ac load, automatic data
acquisition system, automatically loading and unloading control
system, the cooling device, auxiliary control, remote control box
and PC software and so on.
Technical Parameter
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire |
Rated Power | Resistive load:1000kW |
Installed Capacity | Resistive load: 1000kW |
Load Step | 1,2,2,5,10,20,20,50,100,200,200,200,200kW min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC 50Hz |
Wire Connection | Load power supply input——Copper bar (star coupling “Y”) Control power supply input——Busbar |
Insulation | F |
Way of Working | Continuous Working |
Casing Dimensions and Cooling | about 2400*1400*1680mm(length*width*height) Forced air cooling,Horizontal inlet air and
vertical cooling |
Weight | About 1500 kgs / set |
Transportation | Hoisting, there are lifting lug in top of casing, also the wheel
casters can be provided |
Casing Color | Grey(RAL7035)or as you required |
Workplace | Outdoor |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed |
Product Advangent
System can work with PC software to realize intelligent operation,
automatically finish the parameters testing, and create testing
data table, curves and reports that can be printed, reduce a lot of
manual operation.
Application:
1.Manufacturers of standby power generators commonly use load banks
to test and tune newly assembled units
2.generator has been set up in a test cell within the factory, a
test engineer uses the load bank to apply a discrete, selectable
electrical load to the generator and measure the response stability
and endurance.
3.During this process, the test engineer calibrates and adjusts the
generator performance to ensure it meets the intended product
specifications and tolerances.