Home Companies Chongqing Hengtairail Equipment Co.,Ltd.

Puckered Type Railway Gangway EN15085-2 Air Tightness Improved Train Gangway

Chongqing Hengtairail Equipment Co.,Ltd.

Contact Us

[China] country

Trade Verify

Address: A1-3-1, Xinrui Zone, No. 25-1-3, Keyuan 1st Street, Jiulongpo District, Chongqing

Contact name:Wei Dong

Inquir Now

Chongqing Hengtairail Equipment Co.,Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Puckered Type Railway Gangway EN15085-2 Air Tightness Improved Train Gangway

Country/Region china
City & Province chongqing chongqing
Categories Ambulance
InquireNow

Product Details

EN15085-2 Puckered type Gangway Systems For Rail Vehicle

Product Overview

Gangway System is one of the important parts of locomotive and rolling stock. The Gangway Systems is installed at the junction of the adjacent two carriages at the end of the vehicle so that the two carriages form a complete passage. The Interconnecting Gangway is the passage to connect entering and leaving between two carriages.

Product specification

S.No.ItemValue
1CertificateIRIS, ISO9001, CRCC, EN15085
2StandardIRIS 80845:2021 TB/T 3094-2015
Working conditionTemperature-40 ℃ to 50 ℃ (-40 ℉ to 122 ℉)
Relative humidity(The monthly average minimum temperature was 25)≤95%
Altitude≤ 1,500m
maximum wind speed≤ 15m/s, occasionally 33m/s
3Through witdh≥970mm
4Through height≥2,000mm
6Hardness73±3(shore A)
7Brittleness temperature≤-50℃

 

Product advantages

· Sound insulation performance improved, sound reduction index RW≥25dB

· Heat-shielding performance improved, heat transfer coefficient K≤5.0W/(m2·k)

· Ability to pass curves improved, the minimum curve radius that can be passed when connecting is as low as to R145M

 

 

Below is there different types of Gangway Systems FYI

S.No.TypeFeaturesPicture
1EMU High-speed Train GangwaySmall passage width 
No interior panel (roof panel & side panel), simple structure
High requirements to sound insulation, thermal insulation, air tightness
Meet the aerodynamic load requirement for trains meeting with high speed
2Metro GangwayBig passage width 
Most of projects have interior panel
Sound insulation 27~40dB, no air tightness requirement;
Meet the requirements of quick connection and disconnection
3Tram GangwayBig passage width, outer profile is almost same size as car body 
Usually without interior panel
Sound insulation 12~25dB, no air tightness requirement
Puckered type, meet small curve passing requirement

 

 

 

Structure of Gangway Systems

 

 

Application

 

 

Hot Products

Introduce: The elastic side is a dual -acting frequent contact with elasticity. It is suitable for ...
Railway accessories Elastic side bearing for bogie Introduce: The elastic side is a dual-acting ...
Introduce: The elastic side bearing is a dual -acting frequent contact with elasticity. It can be ...
item value Type coupling Material grade E steel Dimensions (L x W x H) (mm) As drawings Place of ...
Product name Railway E50BE knuckle Material AAR M-210 Grade E steel Type E-Knuckle E50BEV Average ...
Product overview The train brake cylinder is a fundamental component of a railway vehicle's braking ...