Home Companies Tongling Tieke Railway Equipment Co.,Ltd

Railway Wagon Derailment Auto Brake Valve Mechanical Acting 54kg/M Rail

Tongling Tieke Railway Equipment Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: Shizishan high and new technology industrial development zone, Tongling city, Anhui Province, 244031, P.R.China

Contact name:Zhang

Inquir Now

Tongling Tieke Railway Equipment Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Railway Wagon Derailment Auto Brake Valve Mechanical Acting 54kg/M Rail

Country/Region china
City & Province tongling anhui
InquireNow

Product Details

Railway Wagon Derailment Auto Brake Valve Mechanical Acting 54kg/M Rail

 

Brief introduction:

Auto brake valve is designed, manufactured and tested according to Chinese standard TB/T3224-2010 ‘Automatic brake valve for derailment of railway freight car’.

It adopts mechanical acting mode and could timely connect the main brake pipes to the atmosphere as soon as it detects the vehicle derails, thus applying emergency brake of the train, minimizing the loss caused by derailment accident.

 
Main parameters:

NameAuto Brake Valve for derailment
ApplicationRailway freight cars
StandardTB/T3224-2010
Quantity1 set each axle
Applicable rail50 kg/m or above
Installation branch pipeline diameter≥ 15.7 mm
Total capacity of branch pipeline for one car≤ 1.5 L
Min radius80 m

 

Main Structure

Mechanical derailment auto brake device is mainly composed of derailment auto brake valve, branch pipes, tee of branch pipe, ball valve, tee of main pipe, etc. The core part is derailment auto brake valve, which comprises of valve body, brake valve rod, pull ring, top beam, adjusting rod, acting rod, lock nut, shrapnel, etc.

 

 

 

Working principle:

When the railway freight car derails for some reason, the wheel and axle position will change and the pull ring or top beam of the derailment auto broken valve will touch and collide with axle, and this force is transmitted to the brake valve rod through the adjusting rod and acting rod. The brake valve rod is designed thin wall structure and easy to be broken at out force. Once the brake valve rod is broken, the brake system’s channel to the atmosphere is opened and the emergency brake will be applied immediately.

When the freight wagon is empty and details, the axle of the derailed wheel set breaks the brake valve rod; when the freight wagon is loaded and derails, the axle of the derailed bogie without derailed wheel set breaks the brake valve rod.

The derailment auto braking process could be concluded as below:

Vehicle derailed-detailed axle and wheels position changed-brake valve rod was sheared-brake system pipe opened with atmosphere-train emergency brake

 

Structure of the brake valve rod(broken part when pressed or pulled):

 

Installation on railway wagons:

 

Why choose us?

  1. Tieke is an authorized railway wagons parts provider of Chinese Railways and our quality is assured;
  2. Tieke provide full ranges of various wagon and wagon spare parts and one stop services for customers;
  3. Tieke is adaptable to different railway gauges, different axle loads, running speeds;
  4. Tieke could design and manufacture according other railway standards like AAR, EN, TB, GOST and etc.

 

FAQ:
Q1: Are you a trading company or a factory?
A: We are directly a factory and we manufacture and export railway wagons, bogies and various wagon parts directly.

Q2: Do you have design ability to provide customized railway wagon parts?
A: Yes, we have professional technical team and we are familiar with international railway standards like UIC, AAR, EN and we are able to provide railway parts according to customer requirements.

Q3: Chinese railway gauge is 1435mm, but our country’s is 1000mm gauge, will this be a problem for you?
A: Of course not, we are able to design railway wagon bogies of different gauges like 1435mm, 1000mm, 1067mm, 1520mm or other required railway gauges.

Q4: Why should I choose you, compared with your competitors?
A: Tieke Railway was transformed from wagons factory belong to Chinese Railway in 2016 and the company have over 10 years’ experiences in manufacturing railway wagons and bogies; Now as Tieke Railway is a private company and adopt modern market management strategies, our services are flexible and more considerate and our cost is more controllable.

Q5: What should I provide to get a quotation from you?
A: You could send your inquiry with detail drawings, product photos, detail technical parameters or requirement description. A complete requirement input is very important for us to provide an accurate quotation to you.

 
 

Hot Products

Railway Crane Wagon 5/10 Tons Hydraulic Lift Crane Transfer Sleepers Rails Ballast Brief introductio...
5T Hydraulic Crane Rail Platform Sleeper Rail Lift Delivery Wagon Brief introduction: Hydraulic ...
100T Heavy Load Wagon Steel Slag Transport Rail Car Steel Factory Rail Wagon Brief introduction: ...
Auto Air Control Unloading Coal Hopper Wagon 70T Pay Load 1435mm Rail Gauge Brief introduction: ...
Air Unloading Coal Railway Wagon with Four Bottom Discharge Hatches Brief introduction: KMF72 Air ...
Product Description: Railway Hopper Wagons - The Perfect Solution for Efficient Freight Transportati...