Home Companies Shenyang iBeehive Technology Co., LTD.

ASTM Q345b Steel Temporary Bailey Bridge Construction Army Military

Shenyang iBeehive Technology Co., LTD.

Contact Us

[China] country

Trade Verify

Address: Room 202, D07 building SISP, Hunnan District, Shenyang

Contact name:Kevin

Inquir Now

Shenyang iBeehive Technology Co., LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

ASTM Q345b Steel Temporary Bailey Bridge Construction Army Military

Country/Region china
City & Province shenyang liaoning
InquireNow

Product Details

Product Description

 

Q345b Steel Bridge Construction Army Military Temporary Bridge

 

About Bailey Bridge

Bailey bridge is used when there is a need to cross an obstacle for a certain time period.This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. Thereby the function also differs on differs on different users of the bridge which could be pedestrians, common vehicles(cars,busses,trucks),heavy military equipment (tank) or the railway.

 

Type
Moudle
Lanes
width
Bridge Deck
Steel Grade
Corrosion
SS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461

 

Company Profile

iBeehive is a professional manufacturer of steel structure, bridge with 22 years experience, finished 3520 projects total 17600000 square meter.We have 2 modern factories with a total area of 21000 m2, iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and the team of professional engineers. Our factories are among the largest and most advanced steel structure production facilities in the world.
iBeehive specializing in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.
The international quality system ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 AWS-D1.1/D1.5 and CWI inspector help us to keep our quality every time.
We provide customers with full steel structures such as factory, warehouse, high-rise building, heavy industry, shopping mall, exhibition centers, infrastructure (railway stations, airports...), a variety of steel structure projects such as Nest-type Beijing Olympic Stadium, Gome Logistics Park, Shenyang DongTa Over-river bridge etc.
Our Purpose is to help customers deliver their projects more quickly, safely and efficiently. We achieve this by providing our value-adding engineering expertise, services and products in the right way to our customers.

Success Case

FAQ

 

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years

Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint

Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish

Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.

Hot Products

Introduction of Steel Structure Warehouse Put your manufacturing process in the front seat: As you ...
Introduction of Steel Structure Warehouse Galvanized Girts, Purlins & C-Sections All iBeehive ...
Introduction of Steel Structure Warehouse METAL BUILDINGS, STEEL BUILDING KITS, GARAGES, & WORKSHOPS ...
Introduction of Steel Structure Warehouse Steel structures are preferred because of the advantages ...
Introduction of Steel Structure Warehouse Framing Systems Rigid Frame Clear Span For use where ...
Introduction of Steel Structure Warehouse Framing Systems Rigid Frame Clear Span For use where ...