Home Companies Shenyang iBeehive Technology Co., LTD.

Prefab Metal Construction Steel Structure Bailey Bridge

Shenyang iBeehive Technology Co., LTD.

Contact Us

[China] country

Trade Verify

Address: Room 202, D07 building SISP, Hunnan District, Shenyang

Contact name:Kevin

Inquir Now

Shenyang iBeehive Technology Co., LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Prefab Metal Construction Steel Structure Bailey Bridge

Country/Region china
City & Province shenyang liaoning
InquireNow

Product Details

High quality steel structure military bailey bridges for hot sale

 

Features

1. Speed construction- pre-engineered components

2. Easy - to handle, transport, assemble, install and reuse

3. Cost effective to own and re-use in different length bridges

4. Damaged parts can be easily and quickly replaced from stock

5. Made of steel with hardwoord for decking

6. All steel is precision CNC machined and laser cut components

7. Faithfully replicates the key component of the original Bailey Bridge, including the Panels, Transoms, Stringers,

Chesses, Ribands, Rakers, Bracing Frames, End Posts and Sway Braces.

8. Additional sections can be added to increase the length of the bridge

9. Additional panels can be added to create Double and Triple panel bridges.

10. Includes all fasteners, pins and bearings

11. Simple exploded view instructions

12. Sections can easily be separated for transport

 

About bailey bridge.

Bailey bridge is used when there is a need to cross an obstacle for a certain time period.This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. Thereby the function also differs on differs on different users of the bridge which could be pedestrians, common vehicles(cars,busses,trucks),heavy military equipment (tank) or the railway.

 

 

 

 

Types 

Type
Moudle
Lanes
width
Bridge Deck
Steel Grade
Corrosion
SS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461

 

Compnents of bailey bridge

 

 

 

 

Quality control

 

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.

For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.

 

 

 

Customer visit

Attend exhibition

FAQ

 

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years

Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint

Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish

Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.

 
 

Hot Products

Low Costs Prefab Workshop Steel Structure Buildings Steel Truss Main Frame STEEL WORKSHOP Advantage ...
Low Costs Prefab Workshop Steel Structure Buildings Steel Truss Main Frame STEEL WORKSHOP Advantage ...
Low Costs Prefab Workshop Steel Structure Buildings Steel Truss Main Frame STEEL WORKSHOP Advantage ...
Factory warehouse prices prefabricated Steel structure prefab steel building with Q345, Q235 etc ...
Steel Shop Buildings Q235, Q345 Steel Shop Packages Steel Garage Workshop Main Structure H Section ...
Steel Frame Buildings Q235, Q345 Industrial Steel Construction Pre Fab Workshop Product Detail: Rust ...