Shenyang iBeehive Technology Co., LTD. |
Verified Suppliers
|
|
Cold Storage Room Metal Sandwich Panels Warehouse Pu Sandwich Panel
1. EPS sandwich panel is made of two layer color coated steel sheet
and an EPS layer in the middle.
2. EPS sandwich panels are flush shapes&peak and valley shapes
available. The joint connection can be teeth shape and clip shape.
3. Thickness(mm) of sandwich panel: 20, 40, 50, 75, 100, 150, 200.
4. Length of sandwich panel: Depend on the construction demand and
generally it is less than 12000mm.
Color steel EPS sandwich panel
It is made of e expandable polystyrene (EPS) foam board with two sides galvanized steel plate covered. The surface can be made one side flat, other side corrugated for roofing or both sides flat for wall. It is now widely used in large-span factory, purification plant, villas.
950 wall sandwich panel | ||
Type | EPS sandwich panel (self-insert connection) All the screw and accessories are available | |
Dimensions | Total thickness | 50,75,100,150,200mm |
Width | 950mm ,1150mm | |
Length | Less than 11.8m | |
External face | Material | Galvanized |
Thickness | 0.15-0.8mm | |
Thickness of the zinc | 80g/m2 | |
Corrosion protection | Galvanized | |
Coating | Polyester | |
Thickness of coating | 20 micron | |
Color | According to the RAL | |
Pattern | Nearly Plain | |
Insulation | Material | EPS |
Thickness | 50,75,100,150,200mm | |
Density | 6-24kg/m3 | |
Thermal conductivity | 0.02~0.03w/mk | |
Internal face | Material | ppgi |
thickness | 0..15-0.8mm | |
Thickness of zinc | 80g/m2 | |
Corrosion protection | Galvanized | |
Coating | Polyester | |
Thickness of coating | 7micron | |
Pattern | Plain | |
Shipping terms | ||
Package | Craft paper or wooded pallet | |
Delivery time | Within 5-10 days after your prepaid | |
Payment terms | T/T ,L/C at sight |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place
order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC
bank) and L/C are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or
TM. Then we issue you an PI for your confirmation. You will be
requested to do pr -epaid full payment or deposit before we go into
production. After we get the deposit, we start to process the
order. We usually need 7-15days if we don't have the items in
stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been
settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective
products?
A: replacement. If there are some defective items, we usually
credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We
check the goods when they go into next step production procedure.