Home Companies TORICH INTERNATIONAL LIMITED

API 5CT J55 N80 Oiled Carbon Drill Casing Pipe Cold Rolled

TORICH INTERNATIONAL LIMITED

Contact Us

[China] country

Trade Verify

Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China

Contact name:Richard SHEN

Inquir Now

TORICH INTERNATIONAL LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

API 5CT J55 N80 Oiled Carbon Drill Casing Pipe Cold Rolled

Country/Region china
City & Province ningbo zhejiang
Categories Metal Casting Machinery
InquireNow

Product Details

TORICH API 5CT J55 N80 Oil Casing Carbon Steel Pipe Fluid Tube Drill Pipes

 

Grade: H40, J55,K55, N80, L80, C90,T95, P110, Q125, V150

Function: Steel pipes used to support oil and gas well walls.

Application: Petroleum casing is a large-diameter pipe that serves to fix oil and natural gas well walls or boreholes. The casing is inserted into the borehole and fixed with cement to help the borehole separate the rock formations and prevent the borehole from collapsing, while ensuring the circulation of drilling mud to facilitate drilling and exploitation.

Length: R-1:4.88~7.62m,R-2:7.62~10.36m,R-3:10.36m to more.

 

 

GradeCSiMnP≤S≤Cr≤Ni≤Cu≤Als≤
API 5CT J550.34-0.390.2-0.351.25-1.50.0200.0150.0150.20.20.02

 


Mechanical Proporties:

Steel Grade
Yield Strength (Mpa)
Tensile Strength (Mpa)
API 5CT J55
379-552
≥517

 

Dimension Tolerance:

Types of steel tubesOuter DiameterWall Thickness
Cold-rolled tubesTube sizes(mm)Tolerances(mm)Tolerances(mm)
≤101.6±0.79-12.5%


Show:

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

Hot Products

St52 Hydraulic Steel Pipe Gas Cylinder Honed Tube Manufacture Method: Cold drawn, hot rolled+deep ...
JIS G 3459 Carbon steel pipes for high pressure service JIS G3459 Stainless Steel Pipe is used for ...
2inch 304 304h stainless steel pipe 304 Stainless Steel Pipe is most suited for applications where ...
Cold Rolled Seamless Steel Tube Cold drawn seamless steel pipe is a precision cold drawn seamless ...
ASTM A192 Carbon Steel Boiler Tubes For High Pressure Boilers Size: OD: 12.7-177.8mm WT: 1-25.4mm ...
fin fan exchanger About Finned Pipe With an aim to increase the heat exchanging efficiency, It’s ...