Home Companies TORICH INTERNATIONAL LIMITED

Torich Cold Drawn Shock Absorber Tube For Hyduaulic Power System

TORICH INTERNATIONAL LIMITED

Contact Us

[China] country

Trade Verify

Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China

Contact name:Richard SHEN

Inquir Now

TORICH INTERNATIONAL LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Torich Cold Drawn Shock Absorber Tube For Hyduaulic Power System

Country/Region china
City & Province ningbo zhejiang
Categories Springs
InquireNow

Product Details

Torich Cold Drawn Shock Absorber Tube for Hyduaulic Power System

 

Referenced Standard:

EN10027-1, Designation system for steels-part1: Steel names

EN10027-2, Designation system for steels-part2: Numerical system

EN10204:2004,Metallic products-Types of inspection documents

EN10266:2003 Steel tubes, fittings and structural hollow sections- symbols and definitions of terms for use in products standard

 

Chemical composition:

Steel grade% by mass
Steel nameSteel numberC maxSi maxMn maxP maxS maxAl min
E2151.02120.100.050.70.0250.0150.025
E2351.03080.170.351.20.0250.0150.015
E3551.05800.220.551.60.0250.0150.02

 

Mechanical Properties:

Steel gradeMechanical properties
Steel nameSteel numberYield strength ReH min MPaTensile strength RM MPaElongnation after fracture A min %
E2151.0212215290-43030
E2351.0308235340-48025
E3551.0580355490-63022
 

 

Product NameAutomobile gas spring shock absorber steel pipes
StandardEN10305, DIN 2393, ASTM A519, etc
Material1020, 16Mn, etc
UsageAutomobile, hydraulic ,shock absorber,etc
TechniqueCold drawn
OD5-420mm
WT0.5-50mm
LengthMax 12000mm
Tolarance±3%
CertificationISO9001 ISO14001 TS16949
Section ShapeRound
PaymentT/T ,L/C,Money Gram, Western Union
DeliveryFOB,CIF,CFR,CPT,etc
PackagePacked in hexagonal in boxes

 
Product Show:




 
 

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

RFQ:

What is your Guarantee?
1.SO9001:2008 and TS16949 certification, SGS, BV, TUV or other third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.

Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation

Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc


How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!

Any more questions about your doubts, please feel free to send us your emails or call

Hot Products

SAE 1022 carbon steel for automobile outer tube 1022 is a general purpose low tensile low hardenabil...
SAE 1020 carbon steel for automobile outer tube Cabon steel grade SAE 1020 is a low hardness and low ...
ASTM A333 Seamless Steel Pipe Standard specification for seamless and welded steel pipe for low ...
EN10305-1 E215 E235 E355 Galvanized Steel Tube with High Precision EN10305-1 tubes are produced by ...
Torich CA 55 CB 60 CB 65 ASTM A671 EFW Boiler Steel Tube Pipes ASTM A 671/A671M-16a Standard ...
Torich 133*4*4113mm 304L Alloy Sputtering Sputtering Target Stainless Steel Tube Grade:304L ...