Home Companies TORICH INTERNATIONAL LIMITED

Professional Alloy Steel Seamless Pipes For Boiler And Superheater

TORICH INTERNATIONAL LIMITED

Contact Us

[China] country

Trade Verify

Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China

Contact name:Richard SHEN

Inquir Now

TORICH INTERNATIONAL LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Professional Alloy Steel Seamless Pipes For Boiler And Superheater

Country/Region china
City & Province ningbo zhejiang
Categories Metal Casting Machinery
InquireNow

Product Details

Products Description
 
TORICH ASTM A209 T1 T1a T1b Seamless Alloy Steel Tubes For Boiler and Superheater Tube
Standard
ASTM A209
Matrial
T1 T1a T1b
Size
OD: 6-420mm WT: 1-50mm Length: according to customer requirement
Application
For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
Manufacture
Tubes are made by seamless process.
At the manufacturer's option, tubing may be furnished either hot finished or cold finished.
Test and Inspection
Mechanical Test, Tension Test
Flaring Test, Flattening Test
Hardness Test, Hydrostatic or Nondestructive Electric Test
 
Chemical Composition
Element
T1
T1a
T1b
Carbon
0.10-0.20
0.15-0.25
0.14 max
Manganese
0.30-0.80
0.30-0.80
0.30-0.80
Phosphorus
0.025
0.025
0.025
Sulfur max
0.025
0.025
0.025
Silicon
0.10-0.50
0.10-0.50
0.10-0.50
Molybdenum
0.44-0.65
0.44-0.65
0.44-0.65
 
Mechanical Properties
Element
T1
T1a
T1b
Tensile Strength min Mpa
380
365
415
Yield Strength min Mpa
205
195
220
Elongation min %
30
30
30
 

Production Show

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A209 T1 T1a T1b Seamless Alloy Steel Tubes For Boiler and Superheater Tube

Hot Products

Cold Drawn Seamless Steel Tube 45MnMoB For Wire - Line Drill Rods Product information Applicatioan: ...
J524 Seamless Low Carbon Steel Tubing Annealed for Bending and Flaring China Automotive Steel Tube ...
Products Description: BS 6323-4 Seamless Cold Drawn Steel Pipes DOM Steel Tube China DOM Steel Tubes ...
Products Description TORICH EN10210-1 Hot Finished Heavy Wall Steel Tubing for General Engineering ...
Hot rolled seamless steel tubes for hydraulic pillar service Basic Info Material 1020 1035 1045 ...
hexagon tube /hex tube Products Detailes Techique seamless square pipe Standard GB/T8162,GB/T8163, ...