Home Companies Dongguan Howe Precision Mold Co., Ltd.

Plastic Two Shot Injection Molding Parts Service HASCO Tool Standard 2k mold

Dongguan Howe Precision Mold Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.39, HeXing road, ShaTou district, Chang'an town, DongGuan City 523863, China

Contact name:Betty Lee

Inquir Now

Dongguan Howe Precision Mold Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Plastic Two Shot Injection Molding Parts Service HASCO Tool Standard 2k mold

Country/Region china
City & Province dongguan guangdong
Categories Moulds
InquireNow

Product Details

Plastic Two Shot Injection Molding Parts Service HASCO Tool Standard

 

Mould Information:

 

Mould material45#,P20,H13,718,2738,NAK80,S136, etc.
Plastic materialPP PE PS PC PU PVC ABS PMMA etc.
Mould baseLKM, HASCO, etc.
Standard ComponentDME,HASCO,JIS etc.
Cavitysingle/multi
Runnerhot/cold
Shaping MouldPlastic Injection Mould
Mould life500,000—2000,000shots
Design softwareUG, PROE, CAD, etc.
Plastic materialPP,PC,PE,ABS,PVC etc.
Steel hardnessHRC45-48
Injection systempin-point, tunnel, edge, fan and sprue gate
TreatmentHeating treatment, Nitriding, Polishing
Quality assuranceISO2000
Delivery time40-50days
PackageWooden Case
TransportBy Sea/air
SpecificationsDepends on customer’s requirements
Process MachineCNC, High-Speed Carve, EDM, Wire Cut, Driller, Grinder, fly cutter, etc.

 

 

1.QuoteAccording to the sample, drawing and specific requirements.
2.DiscussionMold material, cavity number, price, runner, payment, etc.
3.S/C SignatureApproval for all the items
4. AdvancePay 50% by T/T
5.Product Design CheckingWe check the product design. If some position is not perfect, or can not be done on the mould, we will send customers the report.
5.Mould DesignWe make mould design on the basis of confirmed product design and send it to customer for confirmation.
6.Mold ToolingWe start to make mold after mold design confirmed
7.Mold ProcessingSend report to customer once each week
8.Mold TestingSend trial samples and try-out report to customer for confirmation
9. Mold ModificationAccording to customer’s feedback
 
10.Balance settlement50% by T/T after the customer approved the trial sample and mould quality.
 
11.DeliveryDelivery by sea or air. The forwarder can be designated by your side.

 

Advantages of 2K injection molding

 

The parts are strongly fitted and molded thus components or rather end products become more durable.

 

The appearance in terms of aesthetic value or beauty is high since many colours can be blended in the molding stages.

 

There are reduced costs since all manufacturing procedures are completed in the injection stage.

 

Finally, custom made products can be made to suit the user’s preferences

 

 

FAQ :

 

Q. I have an idea for a new product, but not sure if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.

 

Q. My products have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solidworks and Rhino files can all be used to generate quotes, models and mould tools - this can save time and money in producing your parts.


Q. Can I test my idea/product before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make models for design and functional evaluations.


Q. What type of plastic is best for my design/product?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.

 

Q. What type of mould tool do I need?
A. Mould tools can be either a single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.

 

Q. I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3-5 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.

 

Hot Products

Plastic injection mold for auto part from reliable high precision plastic injection mould Mould ...
plastic steering wheel auto part cover/SRS cover auto part plastic mould Our company supplies ...
Plastic Injection Tooling for Plastic Accessories Interior Car Parts Mould Information: Product name ...
OEM/ODM Auto/truck LED Headlight Lens cover plastic injection mould We have the integral processes ...
Auto plastic injection molding high precision plastic injection tooling Mould Information: Item Name...
Auto Plastic Part Molding Auto Part Molding Auto Headlight Plastic Part Mold Product Description: ...