Product Details

PVC Imitation Marble Table Top/Decorative wall panel making machine                                                 
 
PVC imitation marble profile widely used for decorative,such as tile,table top,waist line, door window line, sunshade arc, stair lintel, publicity column frame, frame lines, etc., can be used in high-grade hotels, shopping malls, residential, villa, KTV etc. Building decoration.If you're going to be hone or business place luxury building decoration, imitation marble lines are good options.
 
PVC imitation marble sheet extrusion machine
Process flow:
Mixer→Spiral loader→SJSZ80 double-screw extruder→Mould→Three-roller calender(online laminating)→Cooling group rollers→Hual off→Transversal cutter→Edge cutter→Conveyor→UV treatment
Other auxiliary equipment(optional): 

NameQuantity
SRL-Z type of hot/cool mixer1set
Crusher1set
Miller1set
Air compressor1set

 
The difference between pvc artificial marble sheet and real marble sheet:
Real marble will suffer sulfur dioxide and the price is higher.In addition,the surface of artificial sheet could be changed according to customer's request freely.In addition,it is very important that the intallation is very easier and save a lot of labor cost.
PVC is economic and evironment friendly.It will take more market share gradually.
 
*The lamination is achieved online and don't need any glue or other laminator.After producing this board,if you use UV machine,it would make the board much harder and brighter.
 

.Final Product and Application of Plastic Board Making Machine

 

 

 

 

 

2. After-sales service

2.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time. 

2.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer’s factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer’s factory.

e. If buyer doesn’t request installation and commissioning by Seller’s engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

2.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation: 

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office. 

b. Guarantee period and after-sales services: 13 months since date of bill of lading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price. 

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

2.4. Validity: Three months since quotation date.

We thank you for your inquiry and would be pleased to receive your order soon. 

 

BENK Machinery Co., Ltd.

Hot Products

250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...
250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...
250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...
250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...
250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...
250mm large diameter plastic hdpe pipe extrusion line HDPE large diameter plastic pipe production ...