Home Companies Hebei Zexu Pipe Manufacturing Co., Ltd.

316 Stainless Steel Power Plant Accessories Siphon Rainwater Bucket Side Drain Round Mouth

Hebei Zexu Pipe Manufacturing Co., Ltd.
Active Member

Contact Us

[China] country

Address: Yanshan County, Cangzhou City, Hebei Province

Contact name:Manager Zhao

Inquir Now

Hebei Zexu Pipe Manufacturing Co., Ltd.

316 Stainless Steel Power Plant Accessories Siphon Rainwater Bucket Side Drain Round Mouth

Country/Region china
City & Province cangzhou hebei
InquireNow

Product Details

316 Stainless Steel Side Drain Rainwater Bucket Stainless Steel Siphon Rainwater Bucket Side Drain Round Mouth

 

The rainwater bucket is generally set at the entrance of the roof rainwater from the gutter into the rainwater pipe. The biggest advantage of installing the rainwater bucket is that it can quickly drain the rainwater from the roof. Different types of rainwater buckets are different during installation, so let’s take everyone. Take a look at the side-row rainwater bucket installation atlas, and what are the specific roof rainwater bucket installation methods. Interested friends come to find out!


Side drain rainwater bucket installation


The side-entry rainwater bucket water inlet is installed on the inner side of the side wall of the roof, and the water outlet penetrates the wall to connect to the water bucket, and the rainwater is discharged to the ground or the sewer pipe through the rain water bucket, the water bucket and the pipeline.

 

Specific installation method:

Step 1: Lay out the cable on the building and find a suitable suspension point;

Step 2: Install the mounting plate and suspension rod on the building; Step 3: Place the square steel guide rail on the ground Assemble with the pipe clamp.

 

Installation method of roof rainwater bucket

1. The rainwater bucket is installed on the concrete flat roof

Installation method of roof rainwater bucket

1. The roofing method is designed and constructed according to the civil engineering design.

2. When installing the rainwater bucket, lay the self-adhesive sealing ring and waterproof coiled material on the bucket seat, press the waterproof pressure ring tightly with fixing bolts, and seal the edge with waterproof sealing paste.

3. When using non-embedded installation, the rainwater bucket is installed and the surrounding bucket body should be densely filled with cement mortar or other materials, and the roof top slab should be leveled.

2. The rainwater bucket is installed in the concrete roof gutter

1. The roofing method is designed and constructed according to the civil engineering design.

2. The grate is a finished product, and it can also be replaced by a freshly made grate.

 

Installation method of roof rainwater bucket

3. When installing the rainwater bucket, lay the self-adhesive sealing ring and waterproof coiled material on the bucket seat, press the waterproof pressure ring tightly with fixing bolts, and seal the edge with waterproof sealing paste.

4. When using non-embedded installation, the rainwater bucket is installed, the surrounding bucket body should be densely filled with cement mortar or other materials, and the roof top slab should be leveled.

 

Third, the rainwater bucket is installed in the steel sky (eaves) ditch

 

Side drain rainwater bucket installation atlas

1. The rainwater bucket can be installed in the stainless steel gutter by argon arc welding and direct welding with the gutter.

2. The width of the steel gutter shall be designed according to the project.

Hot Products

Pipeline Steam Purge Test Sputtering Aluminum Plate And Aluminum Target Plate Steam purge 1. Steam ...
Boiler Pipe Steam Purging Mirror Aluminum Target, Aluminum Target, Aluminum Plate After the piping ...
Steam Purging Target Plate Seat, Target Plate Holder, Target Plate Axis, Target Plate Device When ...
Purge Test 12Cr1MoV Target Plate Device High Pressure Target Plate Shaft Aluminum Target Plate The ...
Vapour Sputtering Mirror Aluminum Target Plate Matching Target Plate Device The target plate is a ...
Aluminum target plate for steam purging of large-aperture pipeline 1200mm*80mm*10 finish mirror ...