Home Companies Shandong Kerui Petroleum Equipment Co.,Ltd

ZJ15/1350CZ Truck-mounted drilling rig

Shandong Kerui Petroleum Equipment Co.,Ltd

Contact Us

Trade Verify

Address: Room 1212, Unit A, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District,Beijing,100025,P.R.C

Contact name:

Inquir Now

Shandong Kerui Petroleum Equipment Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

ZJ15/1350CZ Truck-mounted drilling rig

City & Province beijing beijing
InquireNow

Product Details

Detailed Product Description

1. XJ250~XJ1000 workover rig
2. ZJ 10~ZJ40 truck-mounted drilling rig
3. Applied API monogram on main equipment

Products features

   Improved model for drilling and workover operations for shallow wells.
   CAT diesel engine.
   Allison hydraulic transmission.
   10×8 reinforced chassis, fast transportation and good cross-country capacity.
   Air-controlled water-cooling disk auxiliary brake for drawworks is optional.

Main Parameters

Item

Model

ZJ15/1350CZ

1

Drilling depth:m (ft) (4-1/2DP)

1500(4920)

2

Well servicing depth:m(ft)(3-1/2DP)

4000(13123)

3

Max.hook load:KN(lb)

1350(303696)

4

Rope line diameter:mm(in)/number

26(1)/8

5

Max.hook lifting speed:m/s(ft/s)

1.33(4.36)

6

Moving dimensions:m(ft)

19.6×2.9×4.3(64.3×9.5×13.8)

7

Weight:kg(lb)

51000(112430)

8

Power system

CAT3408/C15

9

Engine power:KW(hp)(2100r/min)

354(480)/402(540)

10

Model of hydraulic transmission

ALLISON-S5600HR

11

Emergency power

Select

12

Chassis driven

10×8

13

Min.turning radius:m(ft)

34(111.55)

14

Min.ground clenrance:mm/in

340/13.39

15

Drowworks

Double drum(single drum)

16

Drowworks power:hp

550

17

Diameter of main drum: mm(in)

429×965(16.9×38)

18

Mian brake

Belt type(disc type can be chosen)

19

Auxilary brake

22SR hydro brake(WCB can be chosen)

20

Drawworks lifting shifts

5 forward 1 reverse

21

Derrick model(double sections extension mast)

JJ135/34-W

22

Derrick height: m(ft)

34(111.55)

23

Racking platfrom height: m(ft)

20/21.5(65.62/70.54)

24

Wind speed:km/h(kn)

110(60)

25

control/lighting/electric circuit

24V/220V/380V(china)

26

Rated pressure of hydraulic/air:MPa(psi)

14/0.833-0.93(2002/119.12-133)

27

Rig floor

DZ135/4.5-S telescoping substructure

28

Rotary table

ZP175

29

Treveling block/hook

YG150

30

Swivel

SL135(SL160)

Hot Products

Detailed Product Description 1. XJ250~XJ1000 workover rig 2. ZJ 10~ZJ40 truck-mounted drilling rig 3...
Detailed Product Description 1. ZJ30~ZJ90 RIG 2. Electrical driven drilling rig 3. Mechanical driven ...
Detailed Product Description 1. ZJ30~ZJ90 RIG 2. Electrical driven drilling rig 3. Mechanical driven ...
Detailed Product Description 1. ZJ30~ZJ90 RIG 2. Electrical driven drilling rig 3. Mechanical driven ...
Detailed Product Description 1. ZJ30~ZJ90 RIG 2. Electrical driven drilling rig 3. Mechanical driven ...
Detailed Product Description 1. ZJ30~ZJ90 RIG 2. Electrical driven drilling rig 3. Mechanical driven ...