Home Companies Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

PC400-8 6D125-8 Engine Cylinder Head 6151-11-1104

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Contact Us

[China] country

Trade Verify

Address: Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province

Contact name:wu

Inquir Now

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

PC400-8 6D125-8 Engine Cylinder Head 6151-11-1104

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

PC400-8 6D125-8 Engine Cylinder Head 6151-11-1104

Specification

Applicable models

PC400-8 6D125-8

TypeCylinder Head
Original number6151-11-1104
Warranty6 months
Engine Type Diesel
Brand Name HDPARTS
Condition New
Size OEM Size

 

2. Measures to prevent early wear of cylinders(1) The new or overhauled diesel engine must undergo strict running-in test operation before it can be officially put into operation.(2) Regularly check and maintain the air filter, oil filter, diesel filter, so that it is in a good technical condition to work, which is an important measure to prevent dust impurities from entering the cylinder from the air, fuel and oil passage, reduce cylinder wear and extend the service life of the engine.(3) Replace the oil pan oil regularly, and the added oil must meet the requirements of the manual. When replacing the oil pan oil, the oil pan and lubricating oil circuit should be carefully cleaned, the method is to first drain the spoiled oil, use the same amount of clean diesel, pour into the oil pan, start the engine, idle for 3-5 minutes, drain and clean the diesel, and then clean the oil pan, clean the oil filter at the same time, and finally add the specified amount of oil.(4) It is strictly forbidden to start first and then add water, otherwise it is easy to make the cylinder suddenly cool and crack.(5) Maintain the normal working temperature of the engine frequently, if it is too high, the oil will be diluted, and the lubrication conditions will deteriorate; If it is too low, it will produce acid corrosion, causing pockmarks to peel off. Generally, the suitable working temperature is 70-80 °C, and the evaporative engine can be slightly higher.

 

 

 

 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Hot Products

6SD1 6SD1T EX300-3 EX300-5 Oil Pump 1-13100191-1 L210-0019M For Isuzu Applicable models 6SD1 6SD1T ...
Specification Applicable models M11 Type oil pump Original number 3417674X 3090942 Warranty 6 months ...
Specification Applicable models BF6L913C Type Engine Spare Original number 04159966 04154885 ...
F3L912 F4L912 GJ1704 Oil Pump 02130440 02130441 Applicable models F3L912 F4L912 GJ1704 Product Name ...
Specification Applicable models NT855 Type Engine oil nozzle Original number 3013591 3007976 ...
Specification Applicable models NT855 Type Engine Copper bushing for fuel injector Original number ...