Guangzhou HLMC Machinery Parts Co., Ltd. |
|
VH16100E0373 16100-78060 Excavator Engine Spare Parts Water Pump SK210 SK250 SK260-8 J05E
Product Description
Appliion | SK210 SK250 SK260-8 J05E |
OEM NO. | VH16100E0373 16100-78060 |
MOQ: | 1PCS |
Warranty | Within 3 months |
Certifiion | ISO9001 / TS16949 |
After-sales service | Online support |
Place of Origin | Guangzhou, China(Mainland) |
Applicable industry | Machinery Repair Shops, Construction Works |
Status | 100%NEW |
Service system | Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Online Support, Engineers Available To Service Machinery Overseas, Free Spare Parts |
Product advantages
1. The water pump impeller adopts the raw material Seiko pure
aluminum leaf
2. Using imported high-quality bearings
3. Use high quality seals to ensure no water leakage
4. Original 1:1 mold opening design and manufacture, no deviation
in size, accurate hole position
5. The water pump shaft adopts VG drill steel, pure fluorine rubber
oil seal
6. Using high-strength materials, corrosion resistance, wear
resistance, and long service life
7. 100% inspection of each product before shipment, stable quality
and superior performance
More related products you are looking for
1. Boom Cylinder Seal Kit
2. Excavator Seal Kit
3. Final Drive Seal Kit
4. Floating Oil Seal
5. Center Joint Seal Kit
6. Excavator Solenoid Valve
7. Excavator Hydraulic Parts
8. Track Adjuster Seal Kit
9. Arm Cylinder Seal Kit
10. Hydraulic Breaker Seal Kit
11. TC Oil Seal
12. Excavator Spare Parts
13. Transducer Sensor
14. Excavator Monitor
Water pump failure performance
1. Unstable idle speed:
The failure of the water pump can cause the rotational resistance
of the water pump to increase.
2. There will be noise in the engine part:
This sound is a rolling friive, similar to the sound of "boom boom
boom".
This sound can be accelerated as the engine rotates and changes in
volume
change. This noise generally increases with the severity of the
fault
increasingly obvious.
3. Cooling system failure
1) Hot air is not hot
The most overlooked phenomenon caused by lack of flow. Engine water
in winter
After warming up,
The hot wind cannot blow out, and inexperienced people even think
that
The car is dead, it's time for a replacement. In fact, just replace
a small water pump.
All can solve the problem.
2) Engine water temperature is unstable:
The performance is that the engine water temperature indior needle
fluctuates within a certain range. The reason is
The water temperature in the small cycle is inconsistent due to the
lack of circulation. On the one hand, it leads to
The opening temperature of the thermostat increases, on the other
hand, after the high temperature water flows out, the low
temperature
The water quickly flows to the thermostat, causing the thermostat
to close quickly. Under normal conditions
After warming up, the water temperature of the engine will remain
at a relatively constant
level, approximately at 93°C.
3) The cooling water is reduced, the large circulation is not
smooth, and the engine is high temperature:
At this point, the pump has been relatively serious damage. If you
continue
Driving will directly lead to increased engine damage.
FAQ
Q1. You are a trader or a manufacture?
A1.We are an industry and trade integration business, our factory loed on Guangzhou, Guangdong, China
Q2. How can I be sure the part will fit my excavator?
A2.Give us correct model number/machine serial number/ any numbers on the parts itself. or measure the parts give us dimension or drawing.
Q3. How about the payment terms?
A3.We usually accept T/T or Trade Assurance. other terms also could be negotiated.
Q4. What is your minimum order?
A4.It depends on what you are buying. Normally, Our minimum MOQ is 1PCS
Q5. What is your delivery time?
A5. Generally, it will take 1 to 3 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. What about Quality Control?
A6.We have a perfect QC system for the perfect products. A team who will detect the product quality and specifiion piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.