Home Companies Guangdong Bunge Building Material Industrial Co., Ltd

Custom Hotel Movable Floor to Ceiling Partition Wall With Sliding Aluminium Track

Guangdong Bunge Building Material Industrial Co., Ltd

Contact Us

[China] country

Trade Verify

Address: No. 5-37, Fengxi 2nd Road, Hailong Street, Liwan District, Guangzhou, China

Contact name:Buffy

Inquir Now

Guangdong Bunge Building Material Industrial Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Custom Hotel Movable Floor to Ceiling Partition Wall With Sliding Aluminium Track

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

Sliding Track Floor to Ceiling Hotel Movable Partition Walls

 

Description:
 

The 85-type movable partition is mainly used for the height of the partition of 4 to 6 meters, the sound insulation effect is 25~32db, and the surface material is: MDF, splint, melamine, cloth/leather Pu, and fireproof panels.

 

Melamine: In fact, it is a layer of colored paper pressed on the fiber board;


The moisture resistance of the splint is better than that of the MDF; the disadvantage is that the surface flatness is worse than that of the MDF.


Cloth/leather includes hard packs, soft packs, and is divided into borders (similar to mountings), already covered (the borders are not exposed).

 

Our movable and operable partition system accessories are custom for each client and project,and they are also made of superior material.Track system for right-angled configurations with cross- roller carriers for element weights up to 500 kg. Support rollers in the junctions guarantee easy operation when sliding the elements across intersections .

 
Application:
 

Movable walls can be applied in hotels, Muti-functions halls, Meeting Room, Convention Center, Residential area, College and School, Banquet hall, Training rooms etc. We provide quality and reliable services at very cost effective prices.

 

The partitions shall be top-supported, manually operated panels stacked in an area nominated in the plans. When closed, the operable wall shall provide a complete sound retardant barrier. No floor track shall be used. The tracks are made from extruded anodized aluminum. The track housing shall utilize grooves and interlocking steel pins for better alignment of adjacent track section, and shall be reinforced overhead by drop rod brackets.

 

 
Technical information:

 

Panel SuspensionTop hanging system without the need for a floor track.
Panel WidthEach panel 600mm-1200mm.
TrackAluminum Or Steel Track
Roller on panelSingle or Double Roller
Panel FramesHeavy-duty steel-gusseted aluminum inner frames reinforced with full height.
Top and bottom sealsTop and bottom pressure retractable seals ensure effortless moved and locked.
Module700mm - 1200mm maximum.
Panel stackingNumerous panel stacking options for complete flexibility.
Panel SurfaceMDF,Plywood, woven fabric, Leather,Natural wood veneer, Melamine,Wood moldings, etc.
FinishesSatin anodized or polyester powder coating to all exposed aluminium components available in a wide range of colour as standard.

  
Installing details:
 

1. Before the renovation, the on-site measurement must be performed. According to the measurement data and the construction structure of the site, the design drawings shall be issued by the construction party, and the two parties shall confirm to enter the next step without any doubt.

 

2. Partition production is usually completed by a design company in its own factory. The installation engineering part is produced on site. Therefore, after confirming the design drawings, the requirements for glass thickness, materials, hardware accessories, and borders shall be analyzed and explained.

 

3. Pay attention to the strong and weak power engineering during construction, because he not only concerns the installation and wiring of the company's supporting facilities in the future, so he must find a professional qualified cabling company, and have professional and technical personnel to carefully measure the construction site, and then All the drawings on the drawings show the status of reserved switches, sockets, and the direction of various lines.

 

4. When installing the active partition, be sure to pay attention to the configuration of the air conditioner's reasonable position, especially the central air conditioner. Special attention must be paid to keeping the air outlet and return air outlet in each functional area.

 

 

Operation:

 

A large amount of repairs are as a result of incorrect operation by users. Movable wall panels are deceptively heavy due to the ease of operation but are capable of serious crush injuries.

 

Your work place risk assessments should have taken this into account and state that only trained and authorized personnel may operate the wall. we will offer training on the safe and correct operation of your system to your staff.

 

Movable walls and sliding folding partitions do have a life cycle and there is a point where maintenance and repairs become either impossible or uneconomical.

 

Hot Products

Sliding Soundproof Fabric Surface Office Folding Partition Walls Description: We specialize in easy ...
Sliding Track Floor to Ceiling Hotel Movable Partition Walls Description: The 85-type movable ...
Commercial Melamine Office Sliding Partition Walls Environmental Protection Specification: Sound ...
Operable Floor to Ceiling System Multi Color Banquet Hall Movable Wooden Partition Wall Specificatio...
Banquet Hall Soundproof Operable Walls Classroom Folding Partition Walls About us The BUNGE company ...
Banquet Hall Aluminum Sound Proof Acoustic Movable Partition Walls The details of BUNGE movable ...