Home Companies Ningbo Jinxing Chemical Fiber Co., Ltd.

Concrete Cement Mortar Plaster Spraying Machine Waterproof Injection Grouting Packers

Ningbo Jinxing Chemical Fiber Co., Ltd.
Active Member

Contact Us

[China] country

Address: No:792# Xingzhen Street Kandun Cixi Zhejiang China 315303

Contact name:Cindy Jiang

Inquir Now

Ningbo Jinxing Chemical Fiber Co., Ltd.

Concrete Cement Mortar Plaster Spraying Machine Waterproof Injection Grouting Packers

Country/Region china
City & Province zhejiang
InquireNow

Product Details

 

high quality concrete cement mortar plaster spraying machine waterproof grouting pump

 

high quality concrete cement mortar plaster spraying machine:
 
 
1.Technical Data:

ModelHX-760

 
 

Voltage220V
Power2200W
Delivery capacity0-8L/min
Delivery pressure25bar
Delivery distance60m
Delivery height35m
Maximum aggregate diameter2mm
Hopper capacity20L
Weight44.5kg
CTN’s Dimension1050×500×1050mm

 
2. Application Places:
 
1.Concrete buildings, railway tunnels, highway Bridges, culverts, urban subway, hydropower station, the dam slope harbor engineering such as crack, construction joint, expansion joint grouting waterproof and anchor grouting, the grouting solidarity, backfill grouting and curtain grouting, soft rock reinforcement, honeycomb structure, soil cement grouting or composite grouting engineering, etc.
2. Building wall waterproof coating, cement mortar spraying, dry powder mortar spraying, powder spraying, coating putty, really stone paint spraying, rockery, sculpture handicraft coating engineering etc.
 
3. Advantages:
 
Spray gun used for conveying and closed particles coating materials which is less than 2mm.Under the combination of air compressor, atomizing the material, and spraying evenly on the surface of the building.
Grouting Packer do the function of conveying and closing couting material. Slurry the material into building interior, to achieve the effect of waterproof and stop leakage.
Proper Structure can be repaired to avoid stopping working caused by the repair can be avoided.
 
 
4. Matters Needing Attention:
 
1. The construction place must wear protective equipment (such as gloves, masks, goggles, safety helmet).
2. Before construction, please pour a moderate amount of washing powder or detergent into the hopper, then switched on 1-3 minutes, make the pipe better wetting unobstructed with good mobility. Pure water is not allowed, in order to protect the core will not rust and can start smoothly next time.
3. While the machine is working, the electric box must be closed and locked, to prevent dust and moisture intrusion, and the damage of machine components.
4. Before work and after, often check the reducer and the bearing seat must refuel.
5. Moving the machine in the construction place, regardless of what distance, must pull out the power line first.
6. After construction should be clean the machine and pipe in time, the electric box can only be brushed try, do not wash.
7. When used as a sprayer, subject to equipped with 0.25-0.36 cm3 / min of air compressor and the special sprayer gun.
 
Deliver Time:
15-20days after advance payment
Payment Terms:
T/T,Western Union,Money Gram,PayPal

 
 


 
 
 

 

Hot Products

Nylon fiber crimped Nylon tow crimped Material Nylon polyamide PA6 PA66 Denier 1.0D-70D Color raw ...
Nylon 66 staple fiber 100% virgin cotton spinning Material 100% nylon 66 Denier 1.4D Cut length 38mm ...
100% Nylon fiber crimped Nylon tow,crimped Nylon fiber Material Nylon polyamide Color raw white/dope ...
Polyamide 100% nylon 66 staple fiber USA invista PA66 chips original Material 100% nylon 66 PA66 ...
polyamide nylon fiber full crimped Nylon fiber Nylon flock tow Material 100% nylon Color raw white...
Material 100% nylon Color raw white Denier 10D Cut length 98mm Luster semi-dull Shape round MOQ 8 ...