Ningbo Jinxing Chemical Fiber Co., Ltd. |
|
cement grouting machine:
1.Technical Data:
Model | YY |
|
Voltage | 220V/50HZ | |
Power | 3HP | |
Delivery capacity | 0-8L/min | |
Delivery pressure | 5-8bar | |
Delivery distance | 60m | |
Delivery Weight | 80KG+_5KG | |
aggregate diameter | 4,6,8mm | |
Hopper capacity | 30L | |
CTN’s Dimension | 1050×500×1050mm |
2.Product description:
Mainly used for indoor and outdoor spraying, waterproof grout and waterproof surface coating, waterproof coating, filling, spraying ceilings, walls spray, paint spraying, landscape painting, embossed paint spraying, spraying handicrafts, lacquer, rockery painting, sculpture spray can, sound-absorbing material spraying.
Per hour can be easily sprayed 330m2, work efficiency increased by 25 times.
Basically no ground ash, water, materials, can reduce the cost of 20 or more.
Suitable for spraying material:
Grout. Insulation mortar, waterproofing materials, fire prevention materials, insulation materials, sound-absorbing materials, putty, paint, white latex, lacquer, water, mud, and other water-soluble material, plastic material.
3. Advantages:
Spray gun used for conveying and closed particles coating materials which is less than 2mm.Under the combination of air compressor, atomizing the material, and spraying evenly on the surface of the building.
Grouting Packer do the function of conveying and closing couting material. Slurry the material into building interior, to achieve the effect of waterproof and stop leakage.
Proper Structure can be repaired to avoid stopping working caused by the repair can be avoided.
4. Matters Needing Attention:
1. The construction place must wear protective equipment (such as gloves, masks, goggles, safety helmet).
2. Before construction, please pour a moderate amount of washing powder or detergent into the hopper, then switched on 1-3 minutes, make the pipe better wetting unobstructed with good mobility. Pure water is not allowed, in order to protect the core will not rust and can start smoothly next time.
3. While the machine is working, the electric box must be closed and locked, to prevent dust and moisture intrusion, and the damage of machine components.
4. Before work and after, often check the reducer and the bearing seat must refuel.
5. Moving the machine in the construction place, regardless of what distance, must pull out the power line first.
6. After construction should be clean the machine and pipe in time, the electric box can only be brushed try, do not wash.
7. When used as a sprayer, subject to equipped with 0.25-0.36 cm3 / min of air compressor and the special sprayer gun.
5.Deliver Time:
15-20days after advance payment
6. Payment Terms:
T/T,Western Union,Money Gram,PayPal