Home Companies Henan Dongfang Noodle Machine Group Co., Ltd.

High Automation Ramen Noodle Equipment Fresh Noodle Making Machine SUS304

Henan Dongfang Noodle Machine Group Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.18 Dongfang Road, Mazhai Industrial Zone, Erqi District, Zhengzhou, China

Contact name:Annie

Inquir Now

Henan Dongfang Noodle Machine Group Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Automation Ramen Noodle Equipment Fresh Noodle Making Machine SUS304

Country/Region china
City & Province zhengzhou
InquireNow

Product Details

High Automation Ramen Noodle Equipment Fresh Noodle Making Machine SUS304

 

Ripen fresh noodles are half-cooked fresh noodles, usually rich in water. The taste of fresh noodles is close to homemade noodles. They are full of vitamins and nutrients and are healthier for the body.

 

Ripen Fresh Noodle Production Process:

 

The front parts of ripen fresh noodle equipment has many similarities with the traditional instant noodles. They also go through the processes of automatic flour feeding, continuous noodle mixing, ripen conveying, compound rolling, etc., and then enter the steamer. The steamed noodles are soaked for a period of time, the soaked noodles are loosened by a high-speed rotating drum, and then the oil is wiped on the noodles through the drop cloth curtain.

 

After a period of rest, the noodles are steamed for a second time for further maturation and sterilization. The noodles conveyed by the turning machine are cut to a certain length, and the cut noodles continue to move forward into the air cooling machine. After the noodles are fully cooled, they will be weighed and packaged.

 

Technical Parameters:

 

Product Name

Ripen Fresh Noodle Production Line

Roller Width

510mm

Number of Roller Pairs

8 Pairs

Feature

Fully Automatic

Raw Material

Whear Flour

Control

Frequency Control, PLC

 

FAQ:

 

1.When can I get an engineer from you?

When you have finished preparing the conditions (water, electricity, gas supply, production materials), contact our sales staff. We will send engineers to install your machine and train your staff to use it. Usually, when you are ready, you can contact our sales staff and cooperate with us to process the visa for the engineer, the engineer will arrive within 15 days.

 

2.How long does it take to install?

Depending on your machine order the machine size, we will send one to two engineers to your factory, which will take about 40 to 60 days.

 

Hot Products

8tons8H Ramen Noodle Equipment Ripen Fresh Noodle Production Line Automatic Ripen fresh noodle ...
60000PCS8h Dry Noodle Making Machine Non Fried Round Noodle Production Line Dongfang non fried round ...
12tons24H Dry Noodle Making Machine Stick Noodle Processing Line Automatic Stick noodles are dried ...
18Tons24h Dry Noodle Making Machine Industrial Stick Noodle Processing Line This line is our company...
Type 550 Dry Noodle Making Machine Stick Noodle Production Line 23Tons24h Henan Dongfang Noodle ...
60000pcs8h Dry Noodle Cup Noodle Making Machine Turnkey Instant Noodle Machine Non-fried instant ...