Home Companies Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd

Large Capacity Stone Crushing Production Line In Mining Industry 100TPH

Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd
Active Member

Contact Us

[China] country

Address: 6# Xueyuan Road, Mazhai Industrial Zone, Erqi District, Zhengzhou, Henan, China.

Contact name:Calvin Cui

Inquir Now

Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd

Large Capacity Stone Crushing Production Line In Mining Industry 100TPH

Country/Region china
City & Province zhengzhou henan
InquireNow

Product Details

Large Capacity Stone Crushing Production Line In Mining Industry 100TPH

Configuration of 100TPH Primary Stone Crusher Plant

Equipment

Model

Qty (set)

Capacity(t/h)

Power (kw)

Weight (t)

Dimension (mm)

Vibrating Feeder

GZD960*3800

1

100-160

11

5.00

3850×1950×1630

Jaw Crusher

PEV600*900

1

50-120

75

18.00

2290×2206×2370

Jaw Crusher

PEV250*1000

2

20-60

37*2

7.8*2

1550×1964×1380

Vibrating Screen

2YK1848

1

32-276

18.5

6.00

5200×1800×1100

Sand Maker

VSI1145

1

250-360

440

21.00

5100×2790×3320

Belt Conveyor

B1000/B800/B650

6

200-500

7.5/5.5

 

 

Our primary stone crusher plant mainly refers to the jaw crusher and impact crusher. In the designing

of a crushing plant of any nature and size, to select the right type and size of primary crusher is of great

significance. Generally speaking, this machine is the largest and most expensive single item in the plant; a

mistake in the choice may lead to a full replacement. Therefore, you have to pay close attention when

choosing primary stone crushers. The following tips may be helpful for the selection of primary stone

crusher plant.

1. The name, hardness, humidity of material;

2. Pay attention to the hourly, daily or yearly capacity;

3. The discharging granularity or the final particle size of the finished products;

4. Crushing machine type and size;

5. Feeding method.

Among the five factors, the first three will almost always be ascertainable at least to a close approximation before selecting the proper crushing equipment. Sometimes, as when a new crushing plant,

01′ a new primary crusher set-up, is to be installed at an existing operation, the last three factors will be

pre- established. Otherwise, it is sound practice to consider them as a part of the problem of crusher

selection. The primary crushing setup has something to do with the quarrying or mining operation, and

optimal operating results may finally be realized only by careful adjustment of all equipment selections to

the general plan of operation.

In addition, it is worth mentioning that the influence of these several factors is more or less closely

linked. Therefore, you should not discuss them separately, as a change in one of them may result in a

complete replacement of others.

Hot Products

CE / ISO Certificated Mine Ball Mill for Mineral Ores , Capacity 0.16- 100t/h Introduction: Mining ...
Dry Or Wet Grate Mining Ball Mill For Ore Dressing Production Line 18.5kw Introduction: Mining Ball ...
0.65-90 t/h Mining Ball Mill Grinding For Gold / Copper / Iron Ore Application: Our Mining Ball Mill ...
0.65-90 t/h Mining Ball Mill Grinding For Gold / Copper / Iron Ore Introduction: The ball mill is a ...
Stainless Steel / Ceramic Ball Mill In Beneficiation Industry , Gold Ball Mill Introduction: Ball ...
Energy Saving Mining Ball Mill for Ores , 15KW Ball Milling Machine Introduction: Mining equipment ...