Home Companies Shandong Yijiehongfeng Energy Equipment Co., Ltd

Long Span Steel Construction Buildings Fabricated Structure Formed Steel Bulding

Active Member

Contact Us

[China]

Address: Address: 04899, Haifeng Road, Binhai Economic Zone, Weifang, Shandong, China.

Contact name:Jack Zhang

Shandong Yijiehongfeng Energy Equipment Co., Ltd

Long Span Steel Construction Buildings Fabricated Structure Formed Steel Bulding

Country/Region china
City & Province weifang shandong
Categories Workshops & Plants

Product Details

 

fabricated structure formed steel bulding long-span to Addis Ababa customer

 

1. Specifications of the Steel building ( made of fabricated structure ) :

Main steel frame :H section steel beam and columns
Secondary frame :Galvanized C / Z purlin , steel bracing , tied bar , knee brace , edge cover etc .
Roof & Wall panel :Sandwich panel , corrugated steel sheet or skylight panel
Tie Rod :Circular Steel Tube
Brace :Round Bar
Knee Brace :Angle Steel
Roof Gutter :Color Steel Sheet or galvanized Steel sheet
Rainspout :PVC Pipe
Door :Swing door , sliding door or roller door
Windows :PVC steel or Aluminum Alloy Window
Connecting :Anchor bolt , high-strength bolt , common bolt
Drawing :We can make the design and quotation according to your requirement or your drawing
Installation :Provide full set of construction drawings and video to direct installation ; Engineer are able to stay at site to direct construction

 

 

2. Our Company Brief:

We are a professional manufacture who' s devoted to steel structure building construction. We provide the whole set of services include making construction design, producing products and installation.

We are located in Shandong Province. Our factory workshop covering an area of 200,000 square meters. We have 960 workers,including 50 high quality engineering technical personnel. We could produce up to 15,000 tons of steel structure each month. Including H section, lattice steel structure, tubular structure, space frame etc.

 

We are always stick to the tenent that "quality first,customer first" . When you choose us, you will have peace of mind for many years to come. We are here in Shandong province, China. We are looking forward to your coming!

3. Project case- Argentina Steel Structure workshop Building:

We are the largest steel structure building materials supplier and manufacturer in Shandong, China.

This steel structure building used for workshop built in 2010 year for our Argentina Customer.

Project Conditions:

1) Size: 5930M2

Main workshop area 80m long* 60m wide* 9m Eaves height( ridge height 10m)

Affiliated workshop area: 1130 square meter.

2) Wall & roof material: V-960 light steel sandwich panel

3) Thermal Insulation: 50mm EPS foam, 12kg/ m3

4) Wind load: 0.79kn/ M2

5) Crane: 8 cranes( lifting capacity: 2 ton)

6) Windows and doors: electrical rolling window&doors, aluminium alloy

4. Drawings & Quotation for the Steel building ( made of fabricated structure ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather. We'll quote for you prompt.

 

5. Packaging & Shipping for Steel building ( made of fabricated structure ) :

1) 100% QC inspection before shipment;

2) All frangible panel accessories will be protected by plastic papers and then packaged in wooden box;

3) Delivery time: strictly performer based on contract;

 

6. FAQ:

1) Q: How could I control the cost of building a Steel building ( made of fabricated structure ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a Steel building ( made of fabricated structure ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a Steel building ( made of fabricated structure ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

Hot Products

clear span structures formed big metal buildings cost-saving at Ireland area 1. Characteristics of ...
coastal steel structures formed building structure to ISO code export to Lima 1. Characteristics of ...
dynamic steel frame formed 30x40 metal building DIN code verified 1. Specifications for the Steel ...
estrutura steel frame formed steel metal buildings hot Sell to Kigali market 1. Description of Steel ...
fabricated structure formed steel bulding long-span to Addis Ababa customer 1. Specifications of the ...
fabrication of structural steel work formed icon metal buildings best-selling 1. components and ...