Home Companies TID POWER SYSTEM CO ., LTD

Portable Insulation Scaffolding / High Safety Leight -Weight Insulated Scaffolding

TID POWER SYSTEM CO ., LTD

Contact Us

[China] country

Trade Verify

Address: Weinan High Technology Development Zone, Shaanxi ,China

Contact name:Amy

Inquir Now

TID POWER SYSTEM CO ., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Portable Insulation Scaffolding / High Safety Leight -Weight Insulated Scaffolding

Country/Region china
City & Province weinan Shaanxi
Categories Ingots
InquireNow

Product Details

Portable Insulation Scaffolding / High Safety Leight -Weight Insulated Scaffolding

 

Product:

 1. Applications of Portable Insulation And Scaffolding / High Safety Leight -Weight Insulated Scaffolding

The main structure of the fully insulated scaffold (platform) is a high-strength insulating tube made of glass fiber and epoxy resin (EP). It is built by a ladder frame, a horizontal connecting rod and a diagonal connecting rod, and a support rod plus an insulating platfor

m board. The insulating scaffold (platform) is quick to build, easy to disassemble and assemble, without any installation tools, and convenient to use. It has high mechanical strength, Excellent insulation performance, high flexibility, safety and stability, fast disassembly and assembly, non-conductive, anti-oxidation, corrosion resistance, non-sparking, etc. It is suitable for a variety of live construction sites and high-altitude live operations. It makes up for the inability of insulated bucket trucks to enter the site Insufficient construction.

 

Insulated Scaffolding which are made by fiberglass reinforced plastic, are used for live line inspection at Power substation.
1.Main material:
  1
.1 Frame : Foam filled fiberglass tube in Orange.
  1.2 Plat : Insulation board.
  1.3 Strengthen Bar: Foam filled fiberglass tube in Orange.
  1.4 Joint Part:High Aluminium Alloy
2. Character:
  2.1 It is made by foam filled tube,so that can keep the moisture out .
  2.2 It can be used up to 800KV.
  2.3 High Mechanical resistant to bending and twist
  2
.4 It can be afford 300KG weight.
  2.5.High Resistant to bad weather and corrosion element
  2
.6 easy to assemble and to move.
3. Sizes of 2 types of the modules,Customized Model Available as well:
    - 1m x 1m modules
    - 1m x 2m w/ 5 pins modules
4
.Foot Type:We have two type Adjusted and Movable of Insulated Scaffolding foot.
 

2. Technical Detail information of Portable Insulation And Scaffolding / High Safety Leight -Weight Insulated Scaffolding

 

3. More information of Portable Insulation And Scaffolding / High Safety Leight -Weight Insulated Scaffolding

 

No.Products Code

Size

M

Max. Standing

M

Platform

Mold

Rope

Load Capacity

kg

122005155.001M*1M45M300
222005255.001M*2M45M300
322008188.001M*1M91M300
422008288.001M*2M91M300
52201011010.001M*1M91M300
62201021010.001M*2M91M300
72201211212.001M*1M183M300
82201221212.001M*2M183M300

Support and Services:

Insulated Scaffolding Technical Support and Service

We provide technical support and service for our Insulated Scaffolding products. Our experienced team can help you troubleshoot any issues and provide guidance on best practices for using our products. We strive to provide timely and comprehensive support to ensure your project runs smoothly and efficiently.

We offer online support through our website, as well as telephone and email support. Our team is available to answer any questions you may have about our products and assist you in the event of any technical difficulties.

We also provide on-site training and installation services for our products. Our experienced technicians can help you set up and use your Insulated Scaffolding system correctly and teach you about safety procedures. We will also provide technical support and maintenance to ensure your system is running properly and efficiently.

 

Packing and Shipping:

Packaging

1.Insulated scaffolding should be wrapped in bubble wrap or foam padding to protect it from any bumps or jolts during transport.

2.The scaffolding should be placed into a box that is big enough to fit it. The box should be lined with additional bubble wrap or foam padding.

3.The box should be securely sealed with packing tape to ensure it remains closed during transport.

4.The box should be clearly labeled with the recipient’s address and the words “Fragile” and “Handle With Care”.

Shipping

5.Insulated scaffolding should be shipped via a reliable carrier that offers tracking. This will allow you to easily track the package and ensure it is delivered safely.

6.If available, the package should be insured for its full value in case of any damage during shipping.

7.Once the package is ready to be shipped, it should be sent to the recipient as soon as possible.

Hot Products

UV Resistance Tramway GRP Tube / High Voltage GRP Products for Catenary 1. UV Resistance Tramway GRP ...
High Voltage Tramway GRP Rods / GRP Products For Railway Product 1.The features of High Voltage ...
GRP Catenary GRP Rod Products For Railway and Tramway GRP catenary products refer to the components ...
Customized Line Post Insulator Vertical top End Fitting Product Description of Customized Line Post ...
Customized Line Post Insulator Horizontal top End Fitting Product Description of Customized Line ...
Customized Line Post Insulator Drop Eye Top End Fitting Product Description of Customized Line Post ...