Home Companies Shenzhen FYT LED Co., Ltd

T818 1200W Agricultural LED Grow Lights AC480V HPS With Network Controller

Shenzhen FYT LED Co., Ltd
Active Member

Contact Us

[China] country

Address: 6F, A&B&C Building, Hongmen Industrial Park, Jihua Rd. ,Buji, Longgang District, Shenzhen

Contact name:Loogy Lu

Inquir Now

Shenzhen FYT LED Co., Ltd

T818 1200W Agricultural LED Grow Lights AC480V HPS With Network Controller

Country/Region china
City & Province shenzhen
InquireNow

Product Details

30% Energy Saving T818 1200W Agricultural LED Grow Lights With Integrated Network Controller

 

 

Features

  • Fast and direct replacement for traditional HPS fixture.
  • LED design with aluminum housing for better heat dissipation.cold light distribution favored by crops.
  • Highly energy efficacy up to 2.7umol/J.
  • 30% energy saving compared with HPS. 
  • Broader and more crops-loving spectrum light acceleratescrops'growing and improves quality.
  • No limit of sunshine and season for crops growing.

Applications

Floriculture

AgroTech

Hydroculture

• Green Walls

• Propagation

Urban Farming

Product Specification

 

Input Voltage
AC100-277V / AC277-480V
Input Frequency
47-63Hz
Input Power
400W
800W
1200W
Power Factor
>0.95
PPF
1080μmol/s
2160μmol/s
3240μmol/s
Efficiency
2.7μmol/J
Dimming
1-10V
Available beam angles
110*140°/90°/60°
Type of protection
IP65
Operating Temperature
-20-45℃
Storage Temperature
-40-80℃
Switching cycles
100,000 times
Rated nominal Lifetme
5 Years
Dimensions (L x W x H)
360*298*156mm
651*298*156mm
967*298*156mm
Weight
8.8kg
14kg
22.2kg
CTN SIZE
430*370*220mm
720*370*220mm
1030*370*220mm
Gross Weight
9.8kg
15.5kg
24.2kg

 

FAQ
 

1. Q: Where is your target market?

A: Our products have been exported to Middle East, Southeast Asia, South America and Europe and so on, we are sure we can meet your market demands.

2. Q: What is your MOQ?

A: Depends on the product .Usually the MOQ is 1pcs.

3. Q: How long is the sample production time?

A: About 4-7days. Butif you want a specialsample, it will need some times to make the mold.

 

4. Q: What is the Payment?

A: Usually we adopt the T/T, and we have 3 ways:
1) 30% advance deposit, the Balance should be paid off before shipment.
2) 30% advance deposit, 30% payment before shipment, 40% payment again the B/L copy.
3) 50% advance deposit, the Balance should be paid off after received B/L copy in 3 days.
But if you want to adopt other payments, it will depend on your order quantity.

5. Q:How long is the delivery time?

A: About 7 days

 

Hot Products

Nsf Smart Sensor Food Safe Highbay For Food Factory The NSF HB15 Food Safe Series pendant LED ...
AC100-277V Power&CCT adjustable round shape Hero highbay to save your SKU and cash flow HB07 HERO ...
FYT led SKYBAY G4 HB16 was improved based on our second generation highbay. The new version G4 ...
220-240V cost effective 180lm/W HB07 skybay highbay with IK65 IK10 The HB07 HERO High bay Series are ...
AC200-240V Power adjustable round shape highbay industrial lighting, very cost-effective to save ...
180lm/W IP65 IK10 hero highbay with massive aluminum die-cast heat sink The HB07 HERO High bay ...