Henan Dajing Fan Technology Co., Ltd. |
|
High Pressure Handling Blower Fan 5.5kw High Efficiency Direct Drive
The Model XQA high-pressure centrifugal fan is extensively applied to transmit materials. The transmission medium is air or other non-flammable gases, which are harmless to human. It is generally suitable for enforced high pressure ventilation in such industries as forging and smelting, glass, pottery, electroplating, battery and wireless sectors, etc. It is also used to deliver grain, fodder, ore powder, plastics, etc. in the processing industries. It is also suitable for the combined use with carton machinery and tempered glass equipment.
High Pressure Handling Blower Fan 5.5kw High Efficiency Direct Drive | |||
Centrifugal fan | Air Flow | 200~1600 | m3/h |
Pressure | 4500~7000 | Pa | |
Rotating speed | 2840 | r/min | |
Material | Carbon steel | ||
Motor | Power | 0.75~5.5 | kw |
Voltage | 220/380/440 | v | |
Frequency | 50/60 | hz |
Fan Housing
The fan housing shall be constructed of steel and it shall be thick
and strong enough to withstand the maximum operating weight of the
fan. The housing shall be continuously welded and have an access
door for removing possible foreign bodies.
Wheel
The wheel shall be of the backward curved centrifugal steel type
and all welded. The wheel shall be statically and dynamically
balanced up to ISO 1940-G4.0 standard. Stable airflow and low sound
should be ensured as the wheel is operating at the maximum
allowable speed. Drop in performance shall be avoided as the
operating point moves up or down. The wheel shall be readily
removable for cleaning or maintenance.
Inlet
The inlet shall be designed in line with aerodynamics. It shall be
streamlined for better airflow movement and efficiency, reducing
turbulence and sound.
Centrifugal fan production process:
Case Show:
FAQ
Q1: What information do you need to select the suitable fan model?
A: Air flow, total pressure or static pressure,
voltage, working condition.
Q2: What are your main market places?
A: Europe,America,Japan,Southeast Asia and the Middle
East.
Q3: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll
show you the photos of the products and packages before you pay the
balance.
Q4: What's the delivery time?
A: Usually,It takes 15-30 days.