Home Companies Dongguan Xinbao Instrument Co., Ltd.

IEC Battery Thermal Shock Chamber , Temperature Cycling Chamber Fast Change

Dongguan Xinbao Instrument Co., Ltd.
Active Member

Contact Us

[China] country

Address: The Third Industrial Area,Jingshan Village,Chashan Town,Dongguan City ,China

Contact name:

Inquir Now

Dongguan Xinbao Instrument Co., Ltd.

IEC Battery Thermal Shock Chamber , Temperature Cycling Chamber Fast Change

Country/Region china
City & Province dongguan guangdong
Categories Battery Packs
InquireNow

Product Details

IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber

 

Applicable Industries

IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber that subjects a product to alternating extremes of high and low temperatures in order to observe changes in product characteristics and failure occurrence caused by different materials and their thermal expansion coefficients. Thermal shock chamber utilizes controlled areas for hot, ambient and cold temperatures. The product is moved from ambient to hot or ambient to cold zones. The chamber can be programmed to include a dwell period in the ambient zone if desired.It is applicable to metals, plastic, rubber, electronics amongst other materials. The test result can be Used as a reference or basis for product improvement.

 

 

Specification

ModelXB-OTS-50XB-OTS-80XB-OTS-150XB-OTS-225XB-OTS-408
Internal size WxHxD(cm)  36×40×35  40×50×40  50×60×5060×75×5080×85×60
External size WxHxD(cm)148x175x160150X175X165155x185X165165x200X175185x210x185
Shock Temperature ragne-65°C~150°C
Heating up timeRT~200°C about 35min
Cooling down timeRT~-70°C about 90min
Temp recover time/change time≤ 5min
Temp control accuracy±0.5°C / ±2.0°C
distribution accuracy

 

Shock Temperature ragne-65°C~150°C
Heating up timeRT~200°C about 35min
Cooling down timeRT~-70°C about 90min

Temp recover time/

change time

≤5min / ≤10sec
Temp control accuracy/±0.5°C / ±2.0°C
distribution accuracy
Inner materialsSUS 304# stainless steel plate for inner chamber,and stainless steel plate
+ spray painting for external chamber.
Insulation materialsHigh-temperature high-density amino acid ethyl ester foam insulator material.
SystemsP.I.D+S.S.R+Microcomputer balanced temperature control system.
Cooling systemsSemi-hermetic two-stage compressor (water-cooled) /
hermetic two-stage compressor (air-cooled).
Safety devicesFuse switch, high and low pressure protection switch compressors,
refrigerant pressure protection switch failure warning system, electronic siren.
FittingOutlook window (special purchase), the upper and lower adjustable
compartment two energized measured line hole, casters,level bracket.
Power3 phase AC380V 50HZ/60HZ
ControllerTanwan TATO or TH900C
CompressorGermany / Bock  Brand

 

Features

1.Thermal shork chamber in each zone for peak demand of heating and cooling. Provides extra thermal energy to efficiently meet the MIL-STD 883 requirements.
2.Temperature recorder provides 24 hour part temperature recording as the load travels from zone to zone. Using touch-control graph control as operation interface, easy to operate.
3.The system can be used for automatic Circulation Shock or manual selective shock, capable of setting two zones or three zones shocks as well as cold and thermal shock start-up.
4.Custom-made and optional accessories available.

 

Corresponding Standard

GB11158 GB10589-89 GB10592-89

GB/T10586-89 GB/T2423.22-2001 GB/T2423.1-2001

GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93

ASTM D1735 EIA - 364-59 IEC60068-2-1.1990

IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C

 

Safety Devices of Three-Zone High and Low Temperature Shock Simulate Chamber:

  1. Hot chamber overheat protection switch
  2. Cold chamber overheat protection switch
  3. Air circulator overload alarm
  4. Refrigerator high/low pressure protector
  5. Compressor temperature switch
  6. Air pressure switch
  7. Fuse
  8. Water suspension relay ( water-cooled specification only)
  9. Compressor circuit breaker
  10. Heater circuit breaker
  11. Test area overheat/overcool protector
  12. Air purge valve

 

Thermal Shock Chambers maintenance actions


1) a reasonable choice of installation location to install measures: dry, non-drip of rain and snow place.
2) inspection measures qualified by hand daily for insulation materials is broken steam pipe is blocked for technical confirmation and disposal technology.
3) the alarm can be installed as conditional steam leak or power-off state of alarm sound and light small device to facilitate the holding of risk freezing measures discovery and timely remediation.
4) instrument maintenance inspection measures by the area responsible for regular inspection by a predetermined inspection route. To check the insulation inspection of pipeline valve is normal, the incubator is normal, hydrophobic means is normal, thermal insulation material packaging is intact, electric heating power supply and other components is normal.

 

 

Please feel FREE to contact us if you have any needs.

 

Hot Products

JIS D 0203-R1, R2, S1, S2 Rain Spray Test Chamber Description & Application Rain spray test chamber ...
Stability Temperature Environmental Humidity Chamber for semiconductor product Introduction: ...
R449A Refrigerant Temperature Humidity Test Chamber For Methode Electronics Introduction: Stability ...
R449A Refrigerant Thermal Cycling ClimaticTemperature Humidity Test Chamber Main features: 1. New ...
Burn in Oven temperature thermal cycling test for semiconductor product Introduction: Burn in Oven ...
Factory Environmental Test Machine Spray Flow Mixed Gas Corrosion Test Chamber Specification Model ...