Home Companies Qingdao Kaineng Environmental Protection Technology Co.,LTD

Pin Boiler Parts Boiler Heat Exchange Element Cantilever Structure 316L 304

Qingdao Kaineng Environmental Protection Technology Co.,LTD
Active Member

Contact Us

[China] country

Address: No.3, Guizhou Branch Road, Beiguan Industrial Park, Jiaozhou City, Qingdao, Shandong Province, China

Contact name:Wang

Inquir Now

Qingdao Kaineng Environmental Protection Technology Co.,LTD

Pin Boiler Parts Boiler Heat Exchange Element Cantilever Structure 316L 304

Country/Region china
City & Province qingdao guizhou
Categories Boiler Parts
InquireNow

Product Details

Pin tubes,Boiler heat exchange element,Pin tube directly supplied by the manufacturer

 

Description of pin tube:

Pin tube exhaust gas boiler adopts pin tube to strengthen the extended heating surface of the heat transfer components, the heating surface of both sides of water pipe can be greatly increased, meanwhile the strong turbulence formed by the flue gas flowing through the surface

of pin tube can improve the heat transfer efficiency and reduce the soot accumulation, with advantages of compact structure, high heat efficiency, less equipment investment, and also with shock-proof, noise reduced,fouling prevented,safe and reliable features

 

pin fin tube, boiler tubes

 

boiler pin tubes, carbon steel boiler tubes,

 

Features of pin tube:

Pin fin is a cantilever structure, can vibrate with impact of airflow.

The strong turbulence is formed by the flue gas between the pin tube, with strong turbulence.

 

Advantages of pin tube:

Pin tube strengthens the expanded heating surface of heat transfer components, increases its heating surface of gas side, the heating exchange surface is 7-8 times larger than smooth tube, so that the pin tube exhaust gas boiler is with small structure, light weight, but its heat exchange surface is larger enough.

 

Pin fin boiler tubes,heat exchange tubes, boiler parts

 

Pin fin tube, boiler tube sheet

 

Kaineng Service:

Pre-sale service:

Kaineng helps customer to choose the proper pin fin tubes model according to different heating requirements of various application area. Before delivery we will provide boiler drawings, auxiliary equipment drawings, layout drawing, etc.

 

In-sale service:

Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.

 

After-sale service:

1. provide full range of original quality spare parts.

2. Kaineng offer project guidance service, we will dispatch engineers to your local project site

to guide the installation and commissioning.

3. Our engineers will held a training for boiler workers to ensure the safe operation.

4. Free maintenance and repair for one year and lifelong service.

 

Pin fin tubes boiler tubes China manufacturer Qingdao Kaineng

 

Kaineng fin tubes production line

 

Factory of China boiler manufacturer Kaineng

 

Hot Products

Waste Heat Recovery Boilers for Exhaust Gas Heat Recovery From Wartsilar/GE Jenbacher/Caterpillar ...
Exhaust Gas Heat Recovery Boilers for Power Generation, Steam Boilers for Wartsilar/GE Jenbacher...
1T/3T/6T/7.5T Waste Heat Recovery Boiler System for HFO/Diesel/Natural Gas Generator Sets Steam ...
Waste Heat Steam Boiler, Heat Recovery Boiler for 600KW,750KW,1200KW, 1500KW,2000KW Engine Gensets ...
Power Plant Waste Heat Boiler Engergy Saving Boiler,Flue Gas Heat Recovery Steam Boiler Factory ...
Waste Heat Recovery for Power Generation from Natural Gas Fired Generators, Heat Recovery Boiler ...